Study Guide C-12 Test Questions Flashcards
What are the standard size of HANDICAP accessible stalls in a parking lot ?
18’ x 9’ ( 216” x 108” )
What are the standard size of standard, compact car stalls in a parking lot ?
15’ x 6’
What are the standard size of standard, large size car stalls in a parking lot ?
19’ x 7’ ( 228” x 84” )
What is considered first when planning a traffic control zone ?
The safe flow of traffic through the zone
How many type 2 barricades does it take to close the shoulder and one lane of a freeway ?
4 barricades
( 2 for each lane closed and 2 for the shoulder )
According to cal trans , paint applied to pavement in one coat must be applied at a rate of 1 gallon per:
107 sq ft
According to cal trans, stripes and pavement marking on new surfaces must be applied with how many coats, unless otherwise required specifications ?
2 coats
Which color is most commonly used for stall outlines ?
White
Lighting poles in a parking facility are usually installed _____ of a double row of parking stalls.
Along the centerline
What is overhang ?
Distance from from the striking face of a wheel stop to the property line or wall
How long should you wait before you put a second coat of striping paint on a freeway ?
Until first coat is dry
When laying striping lines, spots should be placed a maximum of every ____ on curves
5 feet
How long must you wait before you put pavement markers on new asphalt that is open to traffic ?
7 days
( 14 days IF you use epoxy adhesive )
Experience has established a _____ width of line as the best practice for pavement markings
5 inch
How do you know you are reaching maximum compaction when rolling with a sheepsfoot roller ?
Roller will start walking out of the compaction area
Why would you put fabric down over old asphalt when overlaying with new asphalt ?
To help control reflection cracking
Where do you dispose of broken concrete ?
Landfill ( if not does meet requirements to put along roadway)
What is benching ?
Making a step-like cut into a slope. Used for erosion control and to tie or key in new fills to an existing slope
According to Caltrans specifications, no more than ___ (by weight ) of high-calcium hydrates lime used for treatment of bases may be retained on a No. 30 sieve.
3%
Most specifications for lime- treated bases require mixing to be completed within _____ hours
72 hours
According to Caltrans specifications, lime should be added to base material to be treated __ to___% ( by weight) of the dry material
2.5% to 5%
According to Caltrans, lime treated base material may not be mixed or spread when atmospheric temperature is below :
35˚F
When working close to an obstruction , such as a manhole, it is preferable to leave a small plug of dirt in the trench, what machine is known to leave a small plug ?
Bucket line trencher
According to Cal/OSHA, all trenches _____ or deeper, must be shored, benched , sloped or otherwise protected.
5 feet
What is a hinge point ?
A point where the fill slope and the road or shoulder grade begin
What is a hinge point ?
A point where a fill slope stops and the road or shoulder grade begins
What is the first step when applying lime to a sub-base surface ?
Scarify the sub base
Lime cures slowly. Sometimes a lime base will initially fail the compaction test. If this happens you should allow about ____ hours to set before retesting.
18 hours
Which equipment would you use for digging a ditch 6 inches wide and 2 feet deep ?
Wheel trencher
What is the correct equipment to use for digging a manhole ?
Backhoe
You are pouring concrete around a culvert. Once it is buried , the distance between the embankment and culvert must be at least :
6 inches
If you are digging a 5 ft trench for a pipe, how wide should the embankment be ?
8 feet
According to Standard Specifications for Public Works Construction , roots must be removed to a depth of ____feet . The asphalt institute requires only ____ feet.
3 feet
2 feet
What does it mean when blue smoke comes out of an asphalt truck ?
Mix is too hot
After aggregate has been watered, spread, and rolled, what stakes should the grader operator follow for fine trimming ?
Guineas or blue tops
Immediately before applying asphaltic emulsion, the surface to be seal must be :
Clean and dry
Standard concrete reaches its design strength in how many days ?
28 days
What is double dumping ?
Spreading a lift of earth material over a previously placed lift that had not been properly compacted
What is stabilization fill ?
An equipment width compacted fill
On public works project, how is concrete removal paid for ?
Per cubic yard. Square yard, or lump sum