Earthwork excavation plan generally prepared with a scale of:
1 horizontal , 10 vertical
If the excavation is exceeding 5 feet in depth and 20 sq ft. In plan area with a depth not more than 1 foot, is termed as _________
Surface Excavation
A plot of land measures 40’x40’ with an average cut depth of 5 feet. How many cubic yards of soil will be cut ?
297 cu.yds
What is a KEY property that is useful in identifying rocks and minerals ?
Density
In mining and geological works, the drilling process is employed for:
Blasting
Exploration
Core Drilling
A highway with separated roadbeds for traffic traveling in opposing directions is referred as ________
Divided Highway
The specified minimum angle intersection for the roadways is ______ degrees.
75˚
The maximum super elevation rate specified for freeways, expressways, multi lane conventional highway is _______
0.10
What is the purpose of mechanical stabilization ?
Improving strength
Plasticity
Stability
Grading is exceeds __________ cubic yards shall be performed as per the in charge engineers’ guidelines and approved grading plans.
5,000 cu.yds
According to CalTrans Standard specifications the type of cement used for cementitious stabilizations of soils is/are :
Type II AND Type V
The precise definition of “backfill” is __________
The material used to fill excavation
What is the maximum permitted slope steepness for the fill ?
2:1
If the slope height is more than 60 feet, it is recommended to construct the terraces at every _______ feet intervals .
30 feet
( terraces are required at every 30 feet intervals with base minimum width of 8 feet )
The import material used for the basement subgrade preparation shall be scratched to a depth of _______ inches below subgrade.
6 “
How should a contractor proceed when a concrete load has arrived on job site and the material comes out of the chute in lumps ?
Reject the load
What is the allowable lippage between pavers ?
1/8”
Handling unanticipated hazardous materials at the project site adds risk to who ?
The Owner
The maximum allowable slope for excavation in general construction is ( Horizontal:Vertical) :
1:1
The largest rock size permitted in road bed excavation fill if the finished grade is within 3 feet is _______ inches
3”
The specified minimum and maximum width of single residential driveways should be ______ feet and ____ feet respectively .
12 ‘ and 20 ‘
As per CalTrans earth specifications, the subgrade soil for the pavement is to be compacted to minimum of 95% laboratory density. This should be achieved to a minimum depth of ______ feet below the finished grade.
2.5 feet
Imported backfill material shall not be more than ______ percent by weight of material passing No. 200 mesh sieve
10%
Excavated materials is generally classified into:
Loose rock
Solid rock
Common excavation