ONLINE CONTRACTORS TEST C12 Flashcards
Earthwork excavation plan generally prepared with a scale of:
1 horizontal , 10 vertical
If the excavation is exceeding 5 feet in depth and 20 sq ft. In plan area with a depth not more than 1 foot, is termed as _________
Surface Excavation
A plot of land measures 40’x40’ with an average cut depth of 5 feet. How many cubic yards of soil will be cut ?
297 cu.yds
What is a KEY property that is useful in identifying rocks and minerals ?
Density
In mining and geological works, the drilling process is employed for:
Blasting
Exploration
Core Drilling
A highway with separated roadbeds for traffic traveling in opposing directions is referred as ________
Divided Highway
The specified minimum angle intersection for the roadways is ______ degrees.
75˚
The maximum super elevation rate specified for freeways, expressways, multi lane conventional highway is _______
0.10
What is the purpose of mechanical stabilization ?
Improving strength
Plasticity
Stability
Grading is exceeds __________ cubic yards shall be performed as per the in charge engineers’ guidelines and approved grading plans.
5,000 cu.yds
According to CalTrans Standard specifications the type of cement used for cementitious stabilizations of soils is/are :
Type II AND Type V
The precise definition of “backfill” is __________
The material used to fill excavation
What is the maximum permitted slope steepness for the fill ?
2:1
If the slope height is more than 60 feet, it is recommended to construct the terraces at every _______ feet intervals .
30 feet
( terraces are required at every 30 feet intervals with base minimum width of 8 feet )
The import material used for the basement subgrade preparation shall be scratched to a depth of _______ inches below subgrade.
6 “
How should a contractor proceed when a concrete load has arrived on job site and the material comes out of the chute in lumps ?
Reject the load
What is the allowable lippage between pavers ?
1/8”
Handling unanticipated hazardous materials at the project site adds risk to who ?
The Owner
The maximum allowable slope for excavation in general construction is ( Horizontal:Vertical) :
1:1
The largest rock size permitted in road bed excavation fill if the finished grade is within 3 feet is _______ inches
3”
The specified minimum and maximum width of single residential driveways should be ______ feet and ____ feet respectively .
12 ‘ and 20 ‘
As per CalTrans earth specifications, the subgrade soil for the pavement is to be compacted to minimum of 95% laboratory density. This should be achieved to a minimum depth of ______ feet below the finished grade.
2.5 feet
Imported backfill material shall not be more than ______ percent by weight of material passing No. 200 mesh sieve
10%
Excavated materials is generally classified into:
Loose rock
Solid rock
Common excavation
If authorized, controlled low-strength material may be used as structure backfill for pipe culverts unless the culvert has a diameter of more than ____ feet
20 feet
According to California Test maximum plasticity index permitted for the backfill material is ______
20%
The specified minimum R-value for the imported backfill material is ______
45
What does the cloud shape represent on a blueprint ?
Revisions
Is it recommended that OPTIONAL right-turn lanes should not be used in combination with right turn only lanes on roads where what type bicycle lanes is present ?
Type II
What are examples for Type B soils ?
Silt , silty loam, sandy loam, granular cohesive solids including angular gravel ( crushed rock )
What are examples for Type A soils ?
Clay, silty clay, clay loam and sandy clay
What are examples for Type C soils ?
Granular soils, sand, gravel , loamy sand, submerged oil and rock
The dimension mentioned for the earth measurements are _______ distances
Horizontal
When placing an aggregate for a highway, what piece of equipment is not required on the first day ?
Scraper
What does the “ F “ mean on the grading stake ?
Fill stake
On a highway plan, what does “RA” stand for ?
Reclaimed asphalt
What does “PG” refer to on the grading stakes ?
Pad grade
The specified minimum angle of intersection for the roadways is _____ degrees
75
Slurry cement backfill must be fluid workable and shall contain at least ______ pounds of cement per cubic yard
188 lbs