DOT Standards Flashcards
You may dispose of concrete by incorporating it in adjacent embankments as long as it is:
Broke into max 10” dimension
Buried at least 3 feet below finished grade
Buries at least 10 feet from the drip line of trees or highway
Cut tree branches that extend over the roadway and hang within _____ of finished grade
20 feet
In embankment areas where the grading plane is ____ feet or more above original ground
2 feet
Disposal from clearing and grubbing activities you must reduce combustible material to chips with a ____ inch maximum thickness.
1/2”
If a dust suppressant or dust control binder is to be used, submit a dust treatment plan at least ___ days before starting job site activitie
15 days
Any point on the completed excavation slope must be within _____ feet of the planned slope, unless the excavation is in rock, in which case, any point on the completed slope must be within ____ feet of the
planned slope
0.5 foot ; 2 feet
Completed slopes must be within ____ foot from the grade established by the Engineer
0.2 foot
If you perform structure backfill compaction by ponding and jetting, the thickness of the backfill layer must not exceed __ feet
4 feet
Bring backfill up uniformly on all sides of structures or drainage facilities. Backfill layer thickness must not exceed ____ foot before compacting.
0.67 foot
Compact structure backfill to a relative compaction of at least 95% percent except you may compact
structure backfill to a relative compaction of at least 90% percent at the following locations:
- Over side drains
- Footings for slope protection , slope paving and aprons
If slurry cement backfill is used for structure backfill, you may reduce the excavation width such that the clear distance between the outside of the pipe and the side of the excavation on each side of the pipe is at least (1) ___ inches for pipes 42 inches or less in diameter or span and (2) ___ for pipes over 42 inches in diameter or span
6 inches for ≤ 42
12 inches for > 42
Construct embankment in layers. The loose thickness of each layer must not exceed __ inches
8 inches
The grading factor used for excavated materials for determining payment quantity for imported borrow is ___
1.0
Scarify the surface of lime stabilized soil at least _______ between each layer.
2 inches
Mix lime on the same day it is applied. After the initial mixing, allow a mellowing period for at least ____ hours before final mixing
36 hours