Route manual: JL and MEL Flashcards
1
Q
New Journey Logbook Procedures
A
- last sheet newJL start a/v library or moc
- route manual follow instructions
- copy:
- cover, open mel/cdl,
- last 2 flts, statement sign next to it
- FWD: total cycles & time
- contact moc replace spare
2
Q
Reporting Defects and abnormalities
A
- recorded before next T/O BRK release & before contact MOC through SOCC
- Defects and resets recorded
- airborne as soon as possible
- Discrepancy column
- doubt: contact FLT ops not MOC
- MOC advises: defer it with mel, reset, sign it or repair by AME (AOG)
3
Q
Rectification process:
A
- rectification column
- Locate MEL: MEL ref, CAT, DMI number
- DIM format: A/C no, LG pg no., snag no. Placard
- deferred discrepancy sheet Advise moc completed
- pen and ink if does it no affect perf
- new DFR for perf ofp rev with new TLR and LDR
- Exceptions above: CDL and QRH GND reset procedure
- Rectified by reset: “system reset carried out as directed by MOC IAW (reference), fault cleared” or direct by moc
4
Q
CAT 2 validation
A
- check route manual
5
Q
Ground reset QRH entry
A
“system reset carried out as directed by MOC IAW (reference), fault cleared”
check route manual
6
Q
ACARS requesting for MOC
A
- “MTC”
- what, why, which, where
- “MEET A/C AT GATE, BULB CHANGE, CABIN SIDE WALL ROW 15-17CD”
7
Q
ACARS addressing:
A
- SOCC: specific departments
- DXP: all coms
- MTC: all moc issues
- HUB(XXX): if TOBT +-5 mins
8
Q
TOBT updating
A
- push cn be +/- 5 mins
- delays if needed
- max 2 updates
- parking brake released after clearance