Roof Flashcards
Hip and ________ tile are to be installed straight with a minimum _______ inch head lap.
Ridge 2”
Rake and _________________ tiles are to be installed straight with a minimum __________ inch head lap.
Field 3”
Roof tile is to be cut ________ of an inch from all roof flashing.
1/2”
What is picture frame nailing on a roof?
First 3 rows of the perimeter field tile are nailed with one nail per tile.
The alignment of roof tile at the overhangs is to be consistent within ________ of an inch.
1/4”
If cut pieces of roof tile cannot be nailed, they must be______?
Secured with an approved mastic or adhesive.
All ________, _________ and _________ roof tile are to be securely nailed.
Hip Ridge Rake
A manufactured _______ and ________ enclosure is to be installed at all hip and ridge locations.
Hip and Ridge
Mud balls are to be _______________ in appearance with no _________ or damage.
Consistent Cracks
Do we paint mud balls?
No
T-tops, pipe jacks, etc., are to conform to the roof tile with a maximum gap of _________ of an inch.
3/8”
Roof flashing is to be completely painted with no visible _________.
Metal
Roofing edge metal is to be installed from the ________ to the ________ of the home with a minimum ________ of an inch overlap.
Rear Front 3”
No roofing edge metal shorter than _______ feet at the front/rear of the home.
3’
Is there any tolerance for damaged or dented roofing edge metal?
No
What do you do with any cracked roof tile?
Replace them
What do you do with roof tile that is chipped larger than 1” in diameter?
Replace it
There should be no more than _______ chipped tile in any consecutive row regardless of chip size.
3
The number of stacked tile at the hip stacks should match the ______________ .
Model
All valleys to be ______________.
Straight
Bird stop, or tile risers are to be installed at all roof tile installations with no _________ , or _________.
Voids or gaps