Roof Flashcards
Hip and ________ tile are to be installed straight with a minimum _______ inch head lap.
Ridge 2”
Rake and _________________ tiles are to be installed straight with a minimum __________ inch head lap.
Field 3”
Roof tile is to be cut ________ of an inch from all roof flashing.
1/2”
What is picture frame nailing on a roof?
First 3 rows of the perimeter field tile are nailed with one nail per tile.
The alignment of roof tile at the overhangs is to be consistent within ________ of an inch.
1/4”
If cut pieces of roof tile cannot be nailed, they must be______?
Secured with an approved mastic or adhesive.
All ________, _________ and _________ roof tile are to be securely nailed.
Hip Ridge Rake
A manufactured _______ and ________ enclosure is to be installed at all hip and ridge locations.
Hip and Ridge
Mud balls are to be _______________ in appearance with no _________ or damage.
Consistent Cracks
Do we paint mud balls?
No
T-tops, pipe jacks, etc., are to conform to the roof tile with a maximum gap of _________ of an inch.
3/8”
Roof flashing is to be completely painted with no visible _________.
Metal
Roofing edge metal is to be installed from the ________ to the ________ of the home with a minimum ________ of an inch overlap.
Rear Front 3”
No roofing edge metal shorter than _______ feet at the front/rear of the home.
3’
Is there any tolerance for damaged or dented roofing edge metal?
No