Rating System Flashcards

1
Q

How is each WELL feature achieved?

A

Through documentation, performance verification, or a combination of both

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What type of documents are design drawings, policy documents, and operations schedules?

A

Annotated documents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which WELL project type applies to a building where up to 10% of the total floor area is occupied by a tenant other than the building owner?

A

New and Existing Buildings (90% is occupied by the building owner)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When can be possible applies Core and Shell?

A

When up to 25% of the project area is fully controlled by the building owner. At least 75% of the project space must be occupied by one or more tenants.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How long does Well v1 registration take?

A

5 years

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

A project team recives the project’s WELL report. In the report , the WELL Performance Testing Agent did not give the project credit for the outdoor biophilia that was integrated into the building design. How can the project team attempt to resolve this solution?

A

Submit an appeal within 180 days of receiving the WELL report

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What must a project do in order to mantain certification for the WELL Building Standard?

A

Register for recertification within 36 month (three years) of receiving initial certification

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Current pilots include which space types?

A
  • retail
  • multi-family residential
  • education
  • restaurant
  • commercial kitchen
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Core & Shell - what % of area is controlled by building owner?

A

25% , but 100% is included in scope for design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Which 5 stakeholders must attend the Stakeholder Charrette?

A

owner, architects, engineers, and facilities management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

In the Stakeholder Charette which 3 tasks must be completed?

A
  1. Perform a values assessment
  2. discuss needs of occupants, focusing on wellness
  3. set future meetings to engage contractors etc.
  4. prepare written doc detailing building’s health mission
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How much time do standard and pilot projects have to complete document submission from date of registration?

A

5 years

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How long does the WELL Assessor have to review 1st round docs?

A

20-25 business days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What do Annotated documents include?

A

existing documents marked up to provide additional info design drawings,
operations schedules
policy documents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

After the Performance Verification is complete, how long does the Assessor have to file the report and score card?

A

40-45 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What do General Documents include?

A

provide details on overall project -
floor plans,
lighting,
mechanical drawings

17
Q

How long does the owner have to respons to the report/score with either acceptance or to initiate curative action or file an appeal?

A

180 calendar days

18
Q

How often does a project need to be recertified to maintain WELL Cert?

A

min every 3 years

19
Q

what 3 types of documents are submitted?

A

annotated documents;
letters of assurance;
general documents