Quality Control Flashcards
flat field uniformity
an analysis of the homogeneity of the detector field
MTF (modulation transfer function)
measure of image sharpness
CNR (contrast to noise ratio)
measure of the detectors ability to distinguish differences between an objects signal in the image and the image noise corruption
SNR (signal to noise ratio)
compares the level of the desired signal to the level of background noise. high SNR= better image
contrast resolution
ability of an imaging system to distinguish similarities of objects in an image
Purpose of phantom image quality
Assure image quality due to xray imaging system is at optimum level
Frequency of phantom image quality
Weekly for digital manufacturers
Equipment and procedure of phantom image quality
-24x30 cm compression paddle, ACR phantom and 4.0mm thick x 1.0 cm diameter acrylic disk
-make sure filter/kVp selection is done at a thickness of 4.5 cm
-mAs value is determined by a short pre-exposure in AEC mode
Performance criteria of phantom image quality
-mAs plus/minus 15%
-optical density 1.40 and higher
-density difference
-phantom must be scored with 2 fibers, 3 speck groups, and 2 masses
Correction action for phantom image quality
Must pass to do clinical images. Immediate action to fix errors or problems before any clinical images are obtained
Purpose of compression thickness indicator
Make sure the indicated thickness is within tolerance
Frequency of compression thickness indicator
Monthly
Equipment and procedure of compression thickness indicator
-2 1 inch tape rolls 4-6cm thick
-Phantom/spot paddle
-compress about 15 lbs
Performance criteria of compression thickness indicator
Within +/- 0.5 cm of accurate thickness is within tolerance
Corrective action of compression thickness indicator
Failure must be corrected within 30 days
Purpose of visual checklist
Assure that the mammographic xray system indicator lights, displays, and mechanical locks and detents are working properly and that system is mechanically safe
Frequency of visual checklist
Monthly (around same time), after service, and upon instillation
Equipment and procedure of visual checklist
Self assessment of testing and looking at all the parts listed to assess for good condition
Performance criteria of visual checklist
All parts of the machine and performance of machine is in good working order and passes/fails