px practice test | review questions Flashcards

1
Q

under what circumstance is the occupant load of a building allowed to increase?

A

the occupant load is allowed to increase if all other code requirements are met AND the occupant load does not exceed one occupant per 7 sf

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

what is included in rentable area?

A

everything the tenant will pay rent on

this includes all interior floor area

this excludes all vertical penetrations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

what is the calculation for rentable area?

A

rentable area = usable area x load factor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

what is the most effective method of evaluating a client’s corporate culture?

A

conducting interviews

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

who establishes the construction allowance during a tenant lease agreement?

A

the building owner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

a 1-hour rated wall needs a door with what time rating?

A

20-minute door

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

if the glass entrance doors to a suite need to be replaced, what type of door will go in its place?

(the partition is 1-hour rated)

A

the door will have to be replaced with either a 20-minute solid door with glass that is also 20-minute rated

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

what is the difference between the slope of a walking surface and a ramp?

A

the slope of a walking surface cannot exceed 1:20

once that slope is exceeded the surface is classified as a ramp

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

which of the following light fixtures takes the longest to warm up?

  • halogen
  • hid
  • fluorescent
  • incandescent
A

hid (high-intensity discharge)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

which of the following elements of a stair must be designed to specific accessibility requirements?

  • riser height + handrail
  • tread depth + riser height
  • nosing + handrail
  • riser height, tread depth, handrail
A

nosing + handrail

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

what is the maximum height of a commercial, accessible stair riser?

A

7”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

what type of slab cannot be penetrated for a stair opening?

A

post-tensioned slabs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

why can a post-tensioned slab not be penetrated?

A

a stair opening would typically require cutting an area larger than the spacing of the post-tensioned cables

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

what cost typically accounts for the largest percentage of overhead?

  • capital expenses
  • indirect labor costs
  • profit
  • salary rates
A

indirect labor costs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

if a client’s program requirements change, who is responsible for the additional services?

A

the designer is responsible for the implementation of the changes, but the client is responsible for the payment of the add services

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

which of the following would not be a ration used to measure the status of a business’s financial health?

  • net profit before taxes
  • revenue per technical staff
  • overhead rate
  • chargeable ratio
A

chargeable ratio

17
Q

what type of business structure allows for the most control by its founders?

A

a partnership

18
Q

if a designer believes that the payment requested by the contractor does not add up with the amount / quality of work completed, what is the best course of action?

A

the designer should only certify the amount that they believe represents the work completed

19
Q

what is a scoping provision?

A

scoping provisions are requirements that dictate how many accessible elements must be proivided

20
Q

based on ibc, in an office setting, how many watts per square foot are allowed to light the building?

21
Q

depending on the occupancy, how is a type v building limited?

A

by a few thousand square feet in area and 1-2 stories in height

22
Q

openings with more than 24” in depth at doors shall provide a clear opening of __________ minimum?

23
Q

what is the test method for flammability of wall + ceiling assemblies?

24
Q

glazing in fire-rated partitions / sidelites may not exceed how many square inches?

25
Q

which occupancy group is the most restrictive and why?

A

a - assembly

these groups are the most restrictive because the deal with the largest groups of people

26
Q

the bottom of a pendant light is required to be how many inches above the finished floor?

27
Q

what is the clearance needed between the cooking surface and the bottom of the wall cabinet?

28
Q

a compact filing system is an example of what type of load?

29
Q

what examples are included in live loads?

A
  • people
  • furniture
  • moving equipment
30
Q

before executing a post-occupancy review, what should the team do prior to collecting data?

  • create the research hypothesis
  • validate the research tool
  • review the business case
  • define the performance metrics
A

validate the research tools

31
Q

does the post-contract phase come near the beginning of a project or closer to project closeout?

A

at the beginning of a project, directly after pre-contract work

32
Q

what is the main purpose of a gantt chair?

A

to show a simple timeline of individual project tasks

33
Q

under which masterformat section would one find acoustical ceilings?

A

division 09 - finishes