Pumping Operations Flashcards

1
Q

Residual Pressure …

A

… is only displayed on the intake gauge when the supply side of the pump is under pressure (from a hydrant, relay engine, or tanker)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Pumping Multiple Lines

A

Drop from static pressure to residual pressure helps determine how many more lines can be supplied

Drop less than 10% - add 3 more lines of equal GPM
Drop from 10% to 20% - add 2 more lines of equal GPM
Drop from 20% to 25% - add 1 more line of equal GPM
Drop exceeding 25% - may be able to pump smaller lines only

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Ladder Pipes

A
  • 80 PSI Automatic Fog Nozzle or Smooth Bore Stacked Tips
  • Automatic Fog Nozzle rated 2000 GPM, however the waterway is limited to 1000 GPM
  • Smooth Bore tips range up to 2”
  • Within 100ft, supply at 150 PSI

*Mid-ship turntables have side intakes; rear-mount turntables have a single rear intake

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Deck Gun

A
  • Fog nozzle at 100 PSI; flow rates 500, 750, 1000, 1250 GPM
  • Smooth Bore NP 80 PSI; Tips:
    1-1/4” - 400 GPM
    1-3/8” - 500 GPM
    1-1/2” - 600 GPM
    1-3/4” - 800 GPM
    2” - 1000 GPM
  • Add 10 to 25 PSI for FL in appliance
  • Add 25 PSI for each 100ft of 2-1/2” siamese hose for FL
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Mini-monitor

A
  • Uses a single 2-1/2” inlet
  • Flows 500 GPM at 100 PSI
  • Hose stretch in excess of 200ft; use siamese and dual 2-1/2” hose
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Hydrant Connections

A
  • Single 5” hose
  • 6” hard suction hook up
  • Full hydrant connection
  • Single 6” soft sleeve hose
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

High Flow Hydrant

A
  • Hard Suction/6” Soft Sleeve hose
  • Permit flow up to 2000 GPM
  • Flow through BIV
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Full Hydrant Connection

A
  • Steamer and one 2-1/2” discharge on the hydrant
  • Connecting second 5” hose to 2-1/2” threads requires Storz to 2-1/2” adapter and additional section of 5” hose
  • Increase water supply by 25%
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Relay Pumping

A
  • Recommended initial PDP is 50 PSI plus 10 PSI per 100ft of hose
  • Goal is 50 PSI residual pressure at each engine pumping w/the exception of the attack engine

Two limitations for source and relay engines:

  • 200 PSI max PDP
  • 10 PSI min residual pressure
  • Practical volume limit 5” hose is 1600 GPM (four times the amount of 2-1/2” hose)
  • Each Engine shall pump 5” hose through LDH discharge. When pumping two 5” lines, the 2-1/2” located on officer’s side is preferred (has 3” piping with 2-1/2” threads)
    • Relay pump in VOLUME/RPM
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Tandem Pumping

A
  • Intake to intake
  • Initial attack engine allows second attack engine to have residual water
  • Providing water from intake avoids high PDP while providing same volume
  • Must be a strong hydrant
  • Initial Attack Engine must have substantial residual pressure
  • Engines must be within one section of hose to limit FL
  • Initial Attack Engine must have all necessary lines in place and flowing prior to transferring residual water
  • Second Attack Engine cannot “steal” water from the Initial Attack Engine
  • Both engines can draw below 10 PSI residual causing both pumps to cavitate
  • Both engines must maintain 10 PSI residual pressure
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Sprinkler Systems

A

150 PSI PDP

  • Drop in pressure means sprinkler heads are opening
  • *When gating down, if pressure does not decrease, water is not flowing
  • **Keep Recirculator open
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Standpipe Systems

A

100 PSI PDP

*If more pressure is needed, have second Engine supply and pump 100 PSI and add to it to increase needed pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

FDCs

A
  • If frozen swivel, install a 2-1/2” double male and then double female
  • If FDC is blocked or inoperable, use 2-1/2” double female and a Siamese, pump into first floor standpipe outlet
  • Pressure reducing standpipe outlet valves will not permit this technique
  • If additional flow is needed, place one or two Siamese adapters into the FDC
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Drafting

A
  • Static water source must be deep enough to allow 1ft of strainer clearance from the bottom and 18” below the water surface
  • Max height for drafting is 25ft
  • If water surface more than 10ft below steamer, do not expect to reach full pump capacity
  • Booster stream can break vortex if one occurs
  • Pumps rated at 1750 or 2000 GPM must use both steamer connections to reach full pump capacity (requiring 4 sections of hard suction)
  • Throttle RPM to 1000-1200 before activating primer
  • 1500 GPM pumps, limit primer to 45 sec
  • 1750 or 2000 GPM, extend primer to 90 sec when using both steamer intakes
  • Allow 50 PSI before disengaging primer
How well did you know this?
1
Not at all
2
3
4
5
Perfectly