NAVSEAINST 4790.8C, SHIPS MAINTENANCE AND MATERIAL MANAGEMENT (3 M) MANUAL Flashcards
What has been developed to provide the Commands Maintenance Team with the tools to plan, schedule, and
control planned maintenance effectively?
PMS
The maintenance procedures developed in accordance with what principles for planned maintenance are the
minimum required to maintain equipment within specifications?
Reliability Centered Maintenance (RCM)
What contains information relative to PMS requirements for specific equipment for which the command is
responsible?
PMS Master File
Who maintains the PMS Master File?
3M System coordinator
What reflects that portion of the PMS Master File that contains only the planned maintenance requirements
applicable to a particular Work Center?
Work Center PMS Manual
What provides a listing of the MlPs for systems and equipment assigned to each Work Center, and systems
and equipment not requiring PMS or currently being evaluated for PMS?
LOEP
What are basic PMS reference documents?
MIPs
How many SYSCOM MlP control numbering systems have been developed based on changing PMS
philosophy and are currently in use?
Three
The SYSCOM MRC Control Number is a how many character alphanumeric code which is assigned to each
MRC?
7
What delineates how frequently the maintenance requirement must be performed?
Periodicity Code
What following the periodicity code indicates a Safety of Ship item?
Asterisk (*)
What following the periodicity code indicates that this procedure is intended to be scheduled and performed
by Off Ship Maintenance Personnel?
Single plus (+)
What following the periodicity code indicates that this procedure is intended to be scheduled and performed
by either Ships Force or Off Ship Maintenance Personnel?
Double plus (++)
What are maintenance requirements that must be accomplished concurrently with another maintenance
requirement?
Mandatory related
What are maintenance requirements that can be accomplished concurrently with another maintenance
requirement for saving of time or manpower considerations?
Convenience related
All or part of the related MRC is performed when specific conditions are present or not met on the
referencing MRC is known as what type of maintenance?
Conditional related
What type of maintenance is corrective in nature used to return system or equipment to operational condition
within predetermined tolerances or limitations?
Unscheduled Maintenance (U)
ICMP tasks are not applicable to submarines and what else?
Carriers
What provide detailed procedures for performing maintenance requirements and describes who, what, how,
and with what resources a specific maintenance requirement will be accomplished?
MRCs
What defines an event that must occur for an MRC to be scheduled?
Situational requirement
What type of event is a persistent event that can be tracked over duration of time (in days)?
State
What type of event is a single occurrence or action that may have a maintenance action tied to it?
Trigger
What type of event is an event that is based on the current value of a measurement in relation to the value at
the time of the last accomplishment?
Metered
What is an aid that is used to determine when the MRC is scheduled based on the occurrence of the event?
Offset Information