A ramp with 1:12 slope, will travel how far.
30 feet 09IBC 1010.4
30 Rooms in a motel, how many handicap spaces are required?
2 : 09 IBC 1106.1
What would be the min/max circle dimension in a bathroom for it to be handicap accessible?
60, ACC 304.3.1
Min/Max height of a fire alarm pull station.
42/48, 09IBC 907.4.2.2
20 Room Motel – How Many Fire Alarm Appliances Devices are Required?
2, 09IBC T 907.5.2.3.3
During which portion of a project would a Steel Joist Delivery most likely present a concern?
Last third ?
A Min/Max sidewalk width during construction:
4ft, 09IBC IBC 3306.2
When planning to control work site traffic, what should be considered?
Construction site itself, “Construction Jobsite Management” pg 154
A theater must have emergency standby power for how long?
90 min, 09IBC 1006.3
Which contract type best matches the progress payment to % of completion:
Cost Plus, “Construction Jobsite Management” pg 183
In estimating, to justify additional costs for security, all should be considered Except:
Ordering in large quantities to save on delivery costs, ?
If working outside near a 50KV power line, how far should you stay from the line?
10 Feet, OSHA 1926.1408 Power Line Safety Table (new) old ref 1926.550 (a)(15)(i)
A door jamb should be installed at what point?
After rough opening is built, “Carpentry” pg 618
If there’s a rough opening for a door, what should be installed first?
Jambs, “Carpentry” pg 618
Where there’s a wall, step flashing should be installed:
Under the shingles, Roofing Pg. 100
How should door stops be installed?
Lock side first, “Carpentry” pg 620
When you have wet soil near an underground utility line, what equipment should you use?
Tracked backhoe, P&E pg 170