Usign a 1/4” : 1” scale, 3 1/2” will represent?
- 14’
Lines that terminate with arrows?
- Dimenstion Lines.
Show building with boundaries?
- Site or Plot plan.
Shows area and location?
- Site or Plot plan.
Shows door and window placement?
- Floor Plans.
External Views of the structure?
- Elevation.
Designates brand and model number of window?
- Window Schedule.
Concrete is made of four parts, which are?
- Water, Sand, Cement, & Aggregate.
Measures horizontal angles only?
- Builders or Dumpy level.
Starting point for laying out a building?
- Benchmark.
If layout for a rectangular building is square?
- Diagonal measures are equal.
Install batter boards when?
- The grade & corners have been established.
Minimum placemetn of batterboards form the point of excavation?
- 4’-0”
Represented by the top fo the batterboards?
- Height of the foundation wall.
Footings DO NOT directly support ?
- Lintels
Sides of footings are molded by boards referred to as?
- Haunch Boards.
Used to hold foundation wall forms together?
- Snap Ties.
Used over window and door openings in concrete block wall?
- Lintels.
When lumber dries, it tends to shrink?
- More in width than link.
When a piece of lumber is cut along the natural age ring, it is called?
- Shake.
Place crown on glulam beams?
- Up or on top.
Horizontal members that carry the heaviest load of attached horizontal members?
- Girder.
Study Chart for holes/notches in wood joist?
- Diagram.
Subfloor plywood underlayment spacing is?
- 1/8” on ends and sides.
Support under a wood deck is?
- Girder.
Standard height for interior doors?
- 6’-8”.
Correct order for hangin a bi-fold door?
- Top track first, then fasten the lower track to the floor directly under the top track.