Monkey Riding Goat Quiz (Level 2 Sections) Flashcards
Includes a reference to the unit price schedule as incorporated into the agreement.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Includes a reference to the unit price schedule as incorporated into the agreement.
B. 01 20 00—Price and Payment Procedures
Requirements regarding the administration of subcontractors and coordination with other contractors and the owner.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Requirements regarding the administration of subcontractors and coordination with other contractors and the owner.
C. 01 30 00—Administrative Requirements
Number of days of prior notice required for work in occupied areas
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Number of days of prior notice required for work in occupied areas
A. 01 10 00—Summary
Requirements and procedures for project coordination, project meetings, and project/site administration
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Requirements and procedures for project coordination, project meetings, and project/site administration
C. 01 30 00—Administrative Requirements
Allowances
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Allowances
B. 01 20 00—Price and Payment Procedures
Requirements for fences, noise and dust barriers, and removal of the hazardous waste from construction operations.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Requirements for fences, noise and dust barriers, and removal of the hazardous waste from construction operations.
E. 01 50 00—Temporary Facilities and Controls
Restrictions on the contractor’s use of premises if the project area will be occupied during construction
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Restrictions on the contractor’s use of premises if the project area will be occupied during construction
A. 01 10 00—Summary
Procedures for specific facility types, including airports, detention facilities, hospitals, shopping centers, and nuclear facilities.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Procedures for specific facility types, including airports, detention facilities, hospitals, shopping centers, and nuclear facilities.
C. 01 30 00—Administrative Requirements
Specified installer’s requirements and procedures for substitution
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Specified installer’s requirements and procedures for substitution
B. 01 20 00—Price and Payment Procedures
States work and utility outage schedules imposed as a result of the owner’s occupancy of affected areas and any owner-required working hours for the contractor’s operations
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
States work and utility outage schedules imposed as a result of the owner’s occupancy of affected areas and any owner-required working hours for the contractor’s operations
A. 01 10 00—Summary
Work areas and access routes to be used by the contractor
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Work areas and access routes to be used by the contractor
A. 01 10 00—Summary
Defines the limits of the work of each alternate and the procedure that will be used for evaluation and acceptance
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Defines the limits of the work of each alternate and the procedure that will be used for evaluation and acceptance
B. 01 20 00—Price and Payment Procedures
Requirements for coordination drawings.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Requirements for coordination drawings.
C. 01 30 00—Administrative Requirements
Who is responsible for actual measurement of unit price quantities and procedures for administration and coordination
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Who is responsible for actual measurement of unit price quantities and procedures for administration and coordination
B. 01 20 00—Price and Payment Procedures
Owner requirements for early partial occupancy of new construction or occupancy of existing buildings
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Owner requirements for early partial occupancy of new construction or occupancy of existing buildings
A. 01 10 00—Summary
Method to allow the contractor or the owner to request clarification about an item of work insufficiently described or detailed in the contract documents.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Method to allow the contractor or the owner to request clarification about an item of work insufficiently described or detailed in the contract documents.
B. 01 20 00—Price and Payment Procedures
Includes owner-furnished material and equipment installed by the contractor to define further the scope of the section.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Includes owner-furnished material and equipment installed by the contractor to define further the scope of the section.
A. 01 10 00—Summary
Procedures to control, measure, and report the quality of the construction and performance of the contractor.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Procedures to control, measure, and report the quality of the construction and performance of the contractor.
D. 01 40 00—Quality Requirements
Construction, review, and use of mock-ups and field samples applied or assembled at the site as quality standards.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Construction, review, and use of mock-ups and field samples applied or assembled at the site as quality standards.
D. 01 40 00—Quality Requirements
Identifies work under other contracts and specifies required work sequences if phasing of the work is critical
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Identifies work under other contracts and specifies required work sequences if phasing of the work is critical
A. 01 10 00—Summary
General requirements and procedures for conducting value analysis, including description of participants, schedule, costs, evaluation, and reports
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
General requirements and procedures for conducting value analysis, including description of participants, schedule, costs, evaluation, and reports
B. 01 20 00—Price and Payment Procedures
Type of contract used and extent of the contract.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Type of contract used and extent of the contract.
A. 01 10 00—Summary
Requirements for temporary elevators, hoists, cranes, scaffolding and platforms, and swing staging.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Requirements for temporary elevators, hoists, cranes, scaffolding and platforms, and swing staging.
E. 01 50 00—Temporary Facilities and Controls
Contractor responsible for installation and costs for field offices and sanitation facilities
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Contractor responsible for installation and costs for field offices and sanitation facilities
E. 01 50 00—Temporary Facilities and Controls
Basic requirements for consideration of the contractor’s proposals for substitution of products, including general rules and procedures for determining whether products are equivalent. If substitutions are allowed both during bidding or negotiating and after the contract is awarded, the procedures here may serve for both time frames, but the procurement requirements will need to refer to this section as the basis for the process during the bidding or negotiating.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Basic requirements for consideration of the contractor’s proposals for substitution of products, including general rules and procedures for determining whether products are equivalent. If substitutions are allowed both during bidding or negotiating and after the contract is awarded, the procedures here may serve for both time frames, but the procurement requirements will need to refer to this section as the basis for the process during the bidding or negotiating.
B. 01 20 00—Price and Payment Procedures
Specifies the modification procedures to be followed and the data required to process contract modifications and to substantiate claims for extra time and costs.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Specifies the modification procedures to be followed and the data required to process contract modifications and to substantiate claims for extra time and costs.
B. 01 20 00—Price and Payment Procedures
Starting and adjusting equipment and systems.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Starting and adjusting equipment and systems.
G. 01 70 00—Execution and Closeout Requirements
Qualifications of testing laboratory, limitations of authority, requirements for contractor cooperation, responsibilities for payment, and reference to required tests.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Qualifications of testing laboratory, limitations of authority, requirements for contractor cooperation, responsibilities for payment, and reference to required tests.
D. 01 40 00—Quality Requirements
Basic requirements for packing, shipping, delivery, and acceptance of products at the site.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Basic requirements for packing, shipping, delivery, and acceptance of products at the site.
F. 01 60 00—Product Requirements
Cleaning during construction, final cleaning, and recycling materials.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Cleaning during construction, final cleaning, and recycling materials.
G. 01 70 00—Execution and Closeout Requirements
Requirements and procedures for maintenance of the facilities, including provisions for maintenance records and logbooks.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Requirements and procedures for maintenance of the facilities, including provisions for maintenance records and logbooks.
I. 01 90 00—Life Cycle Activities
Basic requirements and procedures for coordinating, scheduling, and receiving products to ensure that the condition of the products at the time of delivery is acceptable.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Basic requirements and procedures for coordinating, scheduling, and receiving products to ensure that the condition of the products at the time of delivery is acceptable.
F. 01 60 00—Product Requirements
Administrative and procedural provisions for surface water control and containment devices and their installation and subsequent removal.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Administrative and procedural provisions for surface water control and containment devices and their installation and subsequent removal.
E. 01 50 00—Temporary Facilities and Controls
Procedures for projects requiring exceptional or unusual workmanship of work including restorations, preservations, historic restorations, alterations, and hazardous material abatement.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Procedures for projects requiring exceptional or unusual workmanship of work including restorations, preservations, historic restorations, alterations, and hazardous material abatement.
C. 01 30 00—Administrative Requirements
Basic requirements for packing, shipping, delivery, and acceptance of products at the site.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Basic requirements for packing, shipping, delivery, and acceptance of products at the site.
F. 01 60 00—Product Requirements
Procedures required to identify, correct, and complete punch-list items.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Procedures required to identify, correct, and complete punch-list items.
G. 01 70 00—Execution and Closeout Requirements
Whether existing utilities, services, or facilities are available for construction use and whether existing elevators and toilets may be used by construction personnel in renovation work, rehabilitation projects, or additions to existing facilities.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Whether existing utilities, services, or facilities are available for construction use and whether existing elevators and toilets may be used by construction personnel in renovation work, rehabilitation projects, or additions to existing facilities.
E. 01 50 00—Temporary Facilities and Controls
Procedures related to maintaining and controlling traffic and access to the construction.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Procedures related to maintaining and controlling traffic and access to the construction.
E. 01 50 00—Temporary Facilities and Controls
Number and form of data to be submitted, such as manuals.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Number and form of data to be submitted, such as manuals.
G. 01 70 00—Execution and Closeout Requirements
Requirements and limitations for project identification and temporary signs.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Requirements and limitations for project identification and temporary signs.
E. 01 50 00—Temporary Facilities and Controls
Basic requirements for contractors’ options in selecting products, including general rules and procedures for determining whether products are equivalent.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Basic requirements for contractors’ options in selecting products, including general rules and procedures for determining whether products are equivalent.
F. 01 60 00—Product Requirements
Shop drawing format (prints, reproducible, or electronic deliverables), required number of copies to be submitted, and required number of copies to be retained for the owner’s use.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Shop drawing format (prints, reproducible, or electronic deliverables), required number of copies to be submitted, and required number of copies to be retained for the owner’s use.
C. 01 30 00—Administrative Requirements
Requirements for temporary structures that accommodate access to the construction or to accommodate the owner’s operations.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Requirements for temporary structures that accommodate access to the construction or to accommodate the owner’s operations.
E. 01 50 00—Temporary Facilities and Controls
Administrative procedures for substantial completion and final completion of the work.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Administrative procedures for substantial completion and final completion of the work.
G. 01 70 00—Execution and Closeout Requirements
Basic requirements for preparing to install, erect, or apply products.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Basic requirements for preparing to install, erect, or apply products.
G. 01 70 00—Execution and Closeout Requirements
Temporary water, fire protection, electric service, lighting, telephone, and heating, cooling, and ventilating.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Temporary water, fire protection, electric service, lighting, telephone, and heating, cooling, and ventilating.
E. 01 50 00—Temporary Facilities and Controls
Requirements and procedures for the demonstration of the products and systems used in the facility, including training of the owner’s operations and maintenance staff.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Requirements and procedures for the demonstration of the products and systems used in the facility, including training of the owner’s operations and maintenance staff.
G. 01 70 00—Execution and Closeout Requirements
Basic requirements for deactivating or removing a facility or its systems or equipment from operation, including protection of deactivated facilities, deconstruction/demolition, and removal.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Basic requirements for deactivating or removing a facility or its systems or equipment from operation, including protection of deactivated facilities, deconstruction/demolition, and removal.
I. 01 90 00—Life Cycle Activities
Requirements for closeout submittals such as record documents, warranties, spare parts, and maintenance and operation data.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Requirements for closeout submittals such as record documents, warranties, spare parts, and maintenance and operation data.
G. 01 70 00—Execution and Closeout Requirements
General requirements for the commissioning of the facility and its systems, including the specific responsibilities of the commissioning agent and other contractors.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
General requirements for the commissioning of the facility and its systems, including the specific responsibilities of the commissioning agent and other contractors.
I. 01 90 00—Life Cycle Activities
Basic requirements for handling and storage of products at the site.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Basic requirements for handling and storage of products at the site.
F. 01 60 00—Product Requirements
General performance applicable to the entire facility such as sustainability, energy, and environmental design requirements.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
General performance applicable to the entire facility such as sustainability, energy, and environmental design requirements.
H. 01 80 00—Performance Requirements
Initial construction layout, protection of adjacent construction, and surveying.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Initial construction layout, protection of adjacent construction, and surveying.
G. 01 70 00—Execution and Closeout Requirements
Basic requirements for installing owner-furnished products, but refer to Section 01 64 00—Owner-Furnished Products for the product characteristics.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Basic requirements for installing owner-furnished products, but refer to Section 01 64 00—Owner-Furnished Products for the product characteristics.
G. 01 70 00—Execution and Closeout Requirements
Basic requirements and procedures for protecting finished work and existing finishes, if applicable, while continuing construction.
A. 01 10 00—Summary
B. 01 20 00—Price and Payment Procedures
C. 01 30 00—Administrative Requirements
D. 01 40 00—Quality Requirements
E. 01 50 00—Temporary Facilities and Controls
F. 01 60 00—Product Requirements
G. 01 70 00—Execution and Closeout Requirements
H. 01 80 00—Performance Requirements
I. 01 90 00—Life Cycle Activities
Basic requirements and procedures for protecting finished work and existing finishes, if applicable, while continuing construction.
G. 01 70 00—Execution and Closeout Requirements