IP (Integrative Process) Advanced 1 Flashcards

You may prefer our related Brainscape-certified flashcards:
1
Q

During the goal setting stage, what must a simple box model include?

A

Focus on those aspects that have the biggest performance issues (high level, macro level model) that must assess at least 2 potential load reduction strategies for each category (14 total)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the 7 aspects considered during an energy analysis?

A
  1. Site conditions
  2. Massing and Orientation
  3. Building envelope attributes
  4. Lighting levels
  5. Thermal comfort levels
  6. Plug and process load needs
  7. Programmatic and Operational parameters
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What do water budgets need to include?

A

Quantity of water used over a specific period of time.

Indoor, outdoor, process, makeup water, and on-site water offsets.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What do teams need to submit for the Integrative Process credit?

A

Integrative Process worksheet provided by USGBC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What must a project team provide for implementation of the Integrative Process credit

A

Narrative that documents how analyses informed the design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The Integrative Design Credits is optional for all rating systems except?

A

For Healthcare, it’s a prerequisite

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Define INTEGRATIVE PROCESS

A

An iterative, collaborative approach that involves a project’s stakeholders in the process from the visioning through completion of the construction and throughout building operation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Define DISCOVERY PHASE

A

Pre-Design, Programming, Concept Design, Schematic Design, Design Development (or analysis of rough?)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Define IMPLEMENTATION PHASE

A

Construction details and construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What two documents produced during the integrative process should guide all LEED projects?

A

OPR and BOD which defines the project goals, specifically related to energy and water, and the strategies for meeting them

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

During the discovery phase what would you want to do for energy analysis?

A

Establish the baseline and perform “simple-box” energy model analysis before SD.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

During the discovery phase what would you want to do for water budget analysis?

A

Calculate the amount of water required by the building and associated grounds over a specified time.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The integrative process documentation should include?

A

Action plan that states Goals, Strategies, and Responsible Parties

Identify what LEED certification level to pursue, which credits in order to meet that certification, and who is responsible.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the minimum length of an integrative design charrette ?

A

4 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is a Health Mission Statement?

A

Addresses the triple bottom line values and specifically includes goals and strategies to safeguard the health of the building occupants, its community, and the environment.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What tool can be used to benchmark energy performance for the project’s type, scope, occupancy, and location?

A

EPA Target Finder

17
Q

To meet the Integrative Process requirement, how is one non-potable water supply source used to demonstrate offsets for demand components?

A

Show offsets of at least two of the 3 demand components (indoor, outdoor, and process)

18
Q

What are the steps, in order, of the Integrative Process?

A
  1. Establish Goals
  2. Analysis and Modeling
  3. Documentation via OPR and BOD
19
Q

Define WATER BUDGET

A

Project specific method of calculating the amount of water required by the building and associated grounds