Example Questions Flashcards
Installing occupancy sensors would impact which credits?
EA Credit Optimize Energy Performance and EQ Prerequisite Minimum IAQ Performance
What information of supporting documentation would a project with a zero lot line need to document for compliance with the 2012 EPA Construction General Permit?
A description of special conditions and compliance with any ESC measures.
How are non-regulated load savings be addressed in a whole building energy simulation?
By using the exceptional calculation method.
If a project team used the prescriptive requirements to meet EA Prerequisite Minimum Energy Performance which can the team use in order to participate in a demand response program?
Space peak-load calculations to calculate the minimum reduction in peak electricity demand.
What is the minimum contract length required for Demand Response credit?
One year, but with the intention for multi-year renewal for at least 10% of estimated peak electricity demand.
The use of CBECS database may be needed for which credits?
EA Credit Green Power and Carbon Offsets
EA Credit Renewable Energy Production
How is green power measured?
MWh
Qualified resources for EA Credit Green Power must have come online since what date?
January 1, 2005
What is the minimum contract length for Green Power and Carbon Offsets versus Demand Response?
Green Power and Carbon Offsets= 5 years
Demand Response= 1 year with intent to renew for multiple years