IOI-6 Reactor Vessel In-Service Leak Test Flashcards
State the purpose of IOI-6 Reactor vessel in-service leak test
to provide directions to perform a system leakage test of the reactor vessel AND associated class 1 and 2 piping
state the reactor vessel temperature at which primary and secondary ctmt must be established
200F unless the secondary CTMT and SBGT operability requirements of tech spec 3.10.1 are met
state the maximum pressure rate change allowed by IOI-6
<50#/min
state who is allowed access into the drywell while performing IOI-6
limited to personnel directly involved in the test or cleared by shift supervision
explain the required actions if RPS power or pressure control using G33-F033 (RWCU blowdown) is lost
CRD pumps must be tripped immediately to prevent over-pressurizing the vessel
state the limits places in the recirc pumps while performing IOI-6 reactor vessel in-service leak test.
flow control valve <20%
motor amps <610 amps
Do not exceed 44,500 gpm flow loop