Q

State the purpose of IOI-3, Plant shutdown

A

Safe shutdown from 12% power

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

APRM scram and rod block setpoints with mode switch in STARTUP

A

rod block at >12%

Scram at >18% power

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

APRM scram and rod block setpoints with the mode switch in RUN

A

rod block at <5%

no scram

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Admin cooldown rate for normal shutdown?

A

<90F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Admin cooldown rate for soft shutdown?

A

<25F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Minimum RPV temperature?

A

Vessel flange AND Head flange >70F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Minimum reactor pressure to run two RWCU pumps in the post pump mode?

A

200#

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the reason for securing reactor depressurization while warming and placing shutdown cooling in service?

A

Prevent reactor pressure from decreasing below RHR pressure.

If reactor pressure decreases below RHR pressure, then steam voids can be created in the RHR piping resulting in WATER HAMMER when starting shutdown cooling.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Reason for closely monitoring RPV level while placing shutdown cooling in service?

A

anomalies such as reference leg degassing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are the prerequisites of IOI-3?

A

12% power

turbine shutdown on turning gear

Recirc on LFMG with FCV @ max

RCIC lo press not bypassed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Describe preferred pressure, temp, and reactor water level control in IOI-3 with:

MSIVs open?

A

Bypass valves, RWCU blowdown or FW on startup Lvl Control

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Describe preferred pressure, temp, and reactor water level control in IOI-3 with:

MSIVs closed?

A

SRVs, RCIC or CRD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

During a plant shutdown, when is the running RFPT secured?

A

500#

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

During plant shutdown, what happens at:

500#?

A

The running RFPT is secured

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

During plant shutdown, what happens at:

200#?

A

One RWCU pump is secured

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

During plant shutdown, what happens at:

<135#

A

SDC is placed in service (as close to 40# as possible)

17
Q

During plant shutdown, what happens at:

120#

A

RWCU is placed into the pre-pump mode

All running condensate booster pumps are secured

18
Q

During plant shutdown, what happens at:

60#

A

RCIC automatically isolates

19
Q

During plant shutdown, what happens at:

<210F

A

Head vents are realigned to the Drywell Equipment Drain sump

20
Q

Do NOT run two RWCU pumps in post pump mode at <200# RPV pressure because why?

A

possible loss of NPSH can occur