Q

CDM 2015

A

Ensures H&S issues are properly considered during the projects development so there is no risk to harm to those who build, use and maintain the structure.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

CDM 2015 (Domestic)

A

Not usually carried and are absorbed by the contractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Principal Designer

A

Plan, manage and coordinate H&S (Pre-Construction)
Provide H&S File
Identify, eliminate or control foreseeable risks
Ensure client and contractor are aware of their duties
Provide relevant information to other duty holders

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Client

A

Appoint competent duty holders
Appoint PD and ensure they are aware of role
Allow sufficient time and resources
Prepare/provide preconst info to duty holders
Ensure PD and Contractor carry out duties

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Pre-Construction Information

A

Project Description
Client considerations and management requirements
Environmental restrictions and existing on-site risks
Health and Safety File requirements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Construction Phase Plan

A

Project Description
Management of the works (induction, training, welfare etc)
Arrangements for controlling site risks
Health and Safety File proposals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

F10

A

Used to notify the HSE of the project.

Site Address, name of local authority, project description, contact details, length of project etc

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

RIDDOR

A

Reporting of Injuries Diseases and Dangerous Occurrences Regulations (1995).
Requires a ‘responsible person’ to notify of death/reportable injury/disease to HSE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

COSHH

A

Control Of Substances Hazardous to Health
Duty to employers to control substances

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Asbestos Survey Types

A

Management
Refurb & Demo

Refurbishment / Demolition

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Role of the HSE

A

Prevent work related death, injury and ill-health

Support to local businesses, provide guidance and stats

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Reporting RIDDOR Instances
Whats the Purpose

A

2013
Responsible person should file a report under RIDDOR which is goes to the HSE for events / incidences.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the main RICS Safety Guidance Note

A

Surveying Safely

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Can you explain some of the content of Surveying Safely

A

-Sets out basic, good practice principles for management of H&S by members and firms
-Safe person concept, an individual responsibility for their own, their colleagues and other H&S while at work
-Assessing hazards and risks, dynamic RA
-Visiting site, RA and lone working etc

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Name another RICS H&S Guidance Note. What is included.

A

Asbestos
Details on Asbestos
Where it can be found
Appendix A - Types
Appendix B - Scenarios and duty holders

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

When is a project notifiable?

A

30 days + > 20 people working on site
More than 500 person days

17
Q

Principal Contractor Duties

A

Plan, manage and coordinate H&S in Construction phase
Prepare a CPP
Provide site inductions
Prevent unauthorised access to site
Check people have correct skills/knowledge and experience to do works.

18
Q

What are the WAH Regulations

A

2005
Duty to make sure WAH is planned, supervised and carried out by competent people.
Risk assessment.

19
Q

What are RIDDOR Reporting Requirements

A

Any incidents like fractures, breaks, crushing and overturned plant etc
Anything resulting in off work for 7 days
Must be reported in 10 days of incident, but can be extended to 15 days if this is longer than 7 days in hospital.

20
Q

What is the Joint Fire Code

A

A series of precautions / safe working practices
Ensures adequate detection / prevention measures during design / planning stages and site work is undertaken to the highest standard of fire safety.

21
Q

Key principles of the HASAW

A

1974
A duty on employers to ensure, the health, safety and welfare of employees and to ensure that employees and others are kept safe
Sets out Employer / Employee Responsibilities

22
Q

HASAW Employers Responsibilities

A

Provide training
Have a safe place to work
Have a H&S policy
Undertake risk assessments

23
Q

HASAW Employee Responsbilities

A

Take care of personal H&S and Others
Do not interfere with H&S protocols

24
Q

What duty under CDM are you

A

Designer - Duty of care to review the design and make sure it can be done in the safest way.

25
Q

CSCS

A

Training, experience and qualification to complete works. Different levels visitor, operative and manager.

26
Q

What were the changes in the CDM 15

A

Simplified
CDM Coordinator became Principal Designer, so they can influence the design.

27
Q

What documents are included in the CDM

A

CPP
H&S File
Preconstruction information

28
Q

What do the HSE do?

A

ANSWER

29
Q

What do you do to attend site.

A

Site induction
Risk Assessment
Correct PPE
RICS Surveying Safetly

30
Q

What is Stace’ H&S policy

A

Follow RICS Guide

31
Q

Hackett Review

A

ANSWER

32
Q

How is design influenced above a certain height.

A

Dry risers

33
Q

Lone working

A

notify peiople