€h 20 - Outside Plant Flashcards
20-2 safety procedures
Special sites =
Factories nuclear power plants
20–2 safety procedures
Careful attention aerial bucket trucks =
Winter
20–3 underground pathways
Underground pathways =
Conduit
20–6
Right-of-way =
Easements
20–7 service diversity
Count =
sheet or cable =
route =
backbone =
* binder groups
* sheath or cables
* paths
* backbone cables
20–7
dual entrances =
Except residence, does not belong
20–8 entrance cable guidelines
OSP type cable termination or transition =
Must not exceed 49 feet point of entrance
20–8 entrance cable guidelines
Indoor/outdoor NEC cable=
past 49 feet from point entrance
20–800 cable guidelines
588 ft between =
49ft + 588ft + 49ft = 686ft total
20–9 types of entrances
Underground =
buried =
Aerial =
* Conduit
* out of sight service w/out conduit
* overhead
20–10 placing innerducts
Innerducts =
(2)
* Smaller pathway
* 1 to 2 inch
20–13 terminating conduit designated property line
Cover depth =
Minimum cover of 24 inches
20–13 cover depth
Cold climates =
Minimum burial 50 year freeze point
20–14 designing termination points
ITS designer should design conduits =
4” AFF
20–15 avoid a sunken trench
Refilling a trench =
Tamped
20–15
Shoring =
(2)
* 5ft deep
* 2ft edge of the trench
20–16 maximum span
Aerial =
Not exceed 100 feet