€h 20 - Outside Plant Flashcards

1
Q

20-2 safety procedures

Special sites =

A

Factories nuclear power plants

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

20–2 safety procedures

Careful attention aerial bucket trucks =

A

Winter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

20–3 underground pathways

Underground pathways =

A

Conduit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

20–6

Right-of-way =

A

Easements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

20–7 service diversity

Count =

sheet or cable =

route =

backbone =

A

* binder groups

* sheath or cables

* paths

* backbone cables

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

20–7

dual entrances =

A

Except residence, does not belong

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

20–8 entrance cable guidelines

OSP type cable termination or transition =

A

Must not exceed 49 feet point of entrance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

20–8 entrance cable guidelines

Indoor/outdoor NEC cable=

A

past 49 feet from point entrance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

20–800 cable guidelines

588 ft between =

A

49ft + 588ft + 49ft = 686ft total

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

20–9 types of entrances

Underground =

buried =

Aerial =

A

* Conduit

* out of sight service w/out conduit

* overhead

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

20–10 placing innerducts

Innerducts =

(2)

A

* Smaller pathway

* 1 to 2 inch

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

20–13 terminating conduit designated property line

Cover depth =

A

Minimum cover of 24 inches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

20–13 cover depth

Cold climates =

A

Minimum burial 50 year freeze point

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

20–14 designing termination points

ITS designer should design conduits =

A

4” AFF

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

20–15 avoid a sunken trench

Refilling a trench =

A

Tamped

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

20–15

Shoring =

(2)

A

* 5ft deep

* 2ft edge of the trench

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

20–16 maximum span

Aerial =

A

Not exceed 100 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

20-20 vertical conduit masts

Do not extend the mast > =

19
Q

20-22

Entrance through a wall =

A

0.5in slope/flush

20
Q

20–23 requirements for inside space

Protected or barriers =

(2)

A

* 4 inch diameter

* filled with cement

21
Q

20–24 requirements for inside space

100,000 ft.² =

A

Dedicated room for entrance facilities

22
Q

20–25 pedestal hardware mounted outside walls

Pedestals =

A

150ft each tenant

23
Q

20- 29 Direct buried underground pathways

Trench =

Sunken trench =

subsurface facilities =

A

* 24in of cover

* Tamp

* Call local underground utilities

24
Q

20–30 direct buried underground pathways

Locating methods =

A

Except sonar, does not belong

25
20–31 direct buried and underground pathways Shoring requirements=
5ft deep 24in from edge
26
20–31 joint trench required separations Power = (3)
\* 12in well-tamped earth \* 6in when crossing - in 10ft of rigid PVC
27
20–32 warning tape requirements Warning tape = (2)
\* 12in \* non-detectable or detectable
28
20–32 warning tape requirements Common ground alliance (CGA) =
Color orange
29
20–33 vibratory plow =
Cuts into the ground and cable is fed
30
20–35 conduit guidelines Using corrosion resistant conduit =
Except black iron pipe, does not belong
31
20–36 positioning underground conduit risers on poles Practical =
Field side of the pole
32
20–36 choosing a pull cord Test rating =
200 lb
33
20–39 multiple covers Manhole over 12 feet long= (2)
\*Between 12 feet and 20 feet, use two covers \*over 20 feet, use three covers
34
20–39 MH 's 8ft, 16ft, & 26ft How many covers?
6 covers
35
20–39 identifying covers T= S= TV=
\*telephone \*signal \*CCTV/CATV
36
2039 manhole interior hardware MHs equipped = (3)
\* Pulling eyes 7/8in \* Sump 8in \* Ladder
37
20–39 concrete strength and reinforcement Strength of concrete =
3480 psi
38
20–44 aerial plant criteria Suspension strand and cable =
Placed on the roadside
39
20–45 poles Poles by strength = (2)
## Footnote \* Strongest rated pole at 00 \* Weakest rated pole at 10
40
20–45 poles Withstand the same horizontal load =
24 inch from the top of the pole
41
20–45 pole loading Transverse = vertical = bending =
\* Wind pressure \*weight \*corners
42
20–25 optical fiber cables New strand for the optical fiber cable =
Uppermost
43
20–48 references EAI-758-A =
Outside plant telecommunications