General Rules - Section 2 Flashcards
Who is responsible to use only approved materials in an electrical installation?
- Designing engineer
- Electrical contractor
- Supply authority
- Inspection authority
- Installing electrician
When must one obtain a permit?
Before commencement of any electrical work.
What does “notwithstanding” mean?
Forget what you read, do this instead.
What does “penultimate” mean?
The second last.
In what section are the majority of definitions found in the code book?
Section 0
In section 2 the topic “technical” has four subtopics, what are they?
- General
- Protection of persons and property
- Maintenance and operation
- Enclosures
When should an application for inspection be filed?
When the permit for said work is taken out.
In what table can we find enclosures suitable for use in various locations?
Table 65
Should a permit be filed carefully and in good order?
The permit should be posted conspicuously so as to allow easy access to any person who needs to see it.
What is the maximum voltage to ground in dwelling units?
150V to ground
According to the CEC, soldering flux for copper should be…?
Non corrosive to copper.
Does the inspector have the right to refuse a poor quality installation?
Yes, always.