Bus tie operation is ________ on the ground and _______ in flight.
Bus tie operation is automatic on the ground and manual in flight.
The minimum battery voltage for engine start is ___ volts.
The minimum battery voltage for engine start is 24 volts.
The electrical system is ______ _____.
The electrical system is split bus.
The Avail light on the External Power Switch indicates EPU is connected and _______ is within acceptable range.
The Avail light on the External Power Switch indicates EPU is connected and voltage is within acceptable range.
The EPU receptable is/is not monitored.
The EPU receptable is not monitored.
Visually verify that it is disconnected!!!!
With the generator switches in the on position, the generators will/will not come on automatically after engine start.
With the generator switches in the on position, the generators will come on automatically after engine start.
Batteries are used for all starts, except ________ starts.
Batteries are used for all starts, except windmilling starts.
The Interior button removes power from the aft cabin, except the _________ lights.
The Interior button removes power from the aft cabin, except the emergency lights.
The standby power is tested by selecting the _____ position of the switch for ___ seconds.
The standby power is tested by selecting the TEST position of the switch for 10 seconds.
The standby battery will provide ____ minutes of standby bus power.
The standby battery will provide 180 minutes of standby bus power.
When following the checklist, a minimum of ___ minutes of emergency bus power will be available.
When following the checklist, a minimum of 60 minutes of emergency bus power will be available.
Remote CB Tripped CAS message indicates that a breaker in the _____ ______ has tripped.
Remote CB Tripped CAS message indicates that a breaker in the aft J-Box has tripped.
With a single generator failure, the remainining generator is available to power the entire electrical system. True/False
The ___ ____ can be used to tie the left and right side of the electrical system together.
With a single generator failure, the remainining generator is available to power the entire electrical system. True
The bus tie can be used to tie the left and right side of the electrical system together.
The R and L ELEC buttons disconnect the _____ ____ from the __________ _____ and are used primarily for _____ _____ during electrical failure.
The R and L ELEC buttons disconnect the main bus from the emergency bus and are used primarily for load shed during electrical failure.
The Sovereign has two __-Amp/hour _____ batteries.
The Sovereign has two 44-Amp/hour Ni-Cad batteries.