Documentation & Specs Flashcards

1
Q

The project manual

A
  • Bidding Requirements
  • Supplements to Bid Forms
  • Contract Forms
  • General and Supplementary Conditions
  • Technical Specifications
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Closed Spec

A

Proprietary (Closed) Spec: does not allow for substitution, and typically used to control aesthetics, function, and quality. 
• Identify name, model number, finish type, and submittal requirement. 


How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Open Spec

A

Descriptive (Open) Spec: used in competitive bidding, and does not give the level of control as closed spec.
• Describe characteristics, materials, finishes, workmanship, and fabrication of products and give a list of comparable manufactures. 


Performance Spec: used with vendors who propose products they think will meet requirements
• Describe only the desired/required results. Give no characteristics or manufacturers.

Reference standard spec: description based on the performance of material/assembly in comparison to reference standards set by the accepted authority. For example ASTM (American standard for testing and materials), ANSI (American national standards institute), UL (underwriters laboratory)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Master format spec Part 1

A

Part 1 – General – coverage or scope of a section, administrative, procedural requirements unique to section Example: Summary, References, Definitions, Submittals, Quality Assurance, Delivery, storage, handling, Project and Site conditions, Sequencing and Scheduling, Warranty, Maintenance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Master format spec Part 2

A

Part 2 – Materials –

Materials, Products, and equipment In detail, the quality of items required for incorporation into the project.

Example: Manufacturers, Materials, Manufactured Units, Equipment, Components, Accessories, Mixes, Fabrication, Sources of Quality Control

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Master format spec Part 3

A

Part 3 – Execution

– Details the manner in which products, materials, and equipment will be installed. (also testing)

Example: Examination, Preparation, Erection Installation, Field Quality Control, Adjusting, Cleaning, Demonstration, Protection, Schedules

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

CSI Master Format: Division 00

A

Division 00 — procurement and contracting requirements

Requirements for bidding and contracting, the agreement, bonds and certificates, general conditions, supplementary conditions, addenda, modifications

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

CSI Master Format: Division 01

A

Division 01 — General Requirements

Requirements that apply to the entire project or all the individual technical sections

Summary of the work, pricing and payment, alternates, unit prices, submittal procedures, quality

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

CSI Master Format: Division 02

A

Division 02 — Existing Conditions (natural conditions)

Site remediation, surveying, selective demolition

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

CSI Master Format: Division 03

A

Division 03 — Concrete( footing)

Forms, reinforcement, cast in place, precast concrete, cementitious decks, and underlayment, grouts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

CSI Master Format: Division 04

A

Division 04 — Masonry (concrete block/brick)

Brick, concrete block, stone, glass block, masonry restoration and cleaning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

CSI Master Format: Division 05

A

Division 05 — Metals (beams)

Structural steel, ornamental metals, metal fabrication like stairs and rails etc, expansion joint covers, metal restoration or cleaning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

CSI Master Format: Division 06

A

Division 06 — Wood, Plastics, and Composites (framing)

Structural wood framing, rough carpentry, finish carpentry, architectural woodwork. Structural plastics plastic fabrications, wood and plastic restoration and cleaning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

CSI Master Format: Division 07

A

Division 07 — Thermal and Moisture Protection (insulation water barrier)

Damp and waterproofing, insulation, vapor retarder’s, shingles, roof tiles, siding, membrane roofing, flashing, joint sealers, fire and smoke protection, roof pavers, scuppers, gravel stops

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

CSI Master Format: Division 08

A

Division 08 — Openings (doorways/windows)

Metal/wood doors and windows, Storefronts, skylight, hardware, curtain walls, glazing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

CSI Master Format: Division 09

A

Division 09 — Finishes

All finish materials, plaster, gypsum wallboard, light gauge metal framing, floor and wall tile, Terrazzo, flooring materials, acoustical ceiling’s, paints

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

CSI Master Format: Division 10

A

Division 10 — Specialties

- not standard construction materials, typically small in size

Accessory items, visual display boards, toilet compartments, louvers, grills, prebuilt fireplaces signage, lockers, awnings, storage shelving, toilet and bath accessories

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

CSI Master Format: Division 11

A

Division 11 — Equipment

- indispensable to basic functions of building, tip. bound to mech or elec, generally larger and more expensive than div 10

Architectural equipment, faults, security items, church related equipment, library equipment, theater and stage equipment, musical equipment, laboratory equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

CSI Master Format: Division 12

A

Division 12 — Furnishings

Freestanding furniture and case goods, art, window treatment, accessories, fixed seating for theaters, plants, (includes manufactured casework, custom casework found in division 6)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

CSI Master Format: Division 13

A

Division 13 — Special Construction

- typ much larger, buildings in its own right Structures created from unconventional materials (such as fabric glass and rammed eath)

special purpose rooms, pre-engineered structures, sauna, swimming pools, kennels

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

CSI Master Format: Division 14

A

Division 14 — Conveying Equipment

Elevators, escalators, dumbwaiters, lifts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

CSI Master Format: Division 21

A

Division 21 — Fire Suppression

Detection equipment, alarms, stand pipes, hoses, all types of fire suppression systems

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

CSI Master Format: Division 22

A

Division 22 — Plumbing

Piping cover fixtures, equipment, pipe insulation, gas and vacuum systems

24
Q

CSI Master Format: Division 23

A

Division 23 — Heating Ventilating and Air Conditioning

Heating and cooling equipment, ductwork, hoods

25
Q

CSI Master Format: Division 25

A

Division 25 - Integrated Automation

Energy monitoring and control, environmental control, lighting control

26
Q

CSI Master Format: Division 26

A

Division 26 — Electrical

Electrical controls, wiring, switchgear, transformers, low-voltage systems, generators, lighting

27
Q

CSI Master Format: Division 27

A

Division 27 - Communications

Computer networks, cabling, communication systems, voice and audio visual communications

28
Q

CSI Master Format: Division 28

A

Division 28 - Electronic Safety and Security

Intrusion detection, access control, video surveillance, fire detection, radiation detection, gas detection, refrigerant protection, water detection

29
Q

CSI Master Format: Division 31

A

Division 31 — Earthwork

below grade work, Modifications to the land, excavation, fill, grading, slow protection shoring, underpinning, excavation support and protection, special foundation systems, such as piles, caissons and tunneling

30
Q

CSI Master Format: Division 32

A

Division 32 — Exterior Improvements

Above grade site work, paving, athletic and recreational surfacing, fences, kids, retaining walls, site furnishings, wetlands, irrigation, planting

31
Q

CSI Master Format: Division 33

A

Division 33 — Utilities

Water utilities, distribution, disinfection, storage, Wells, sanitary sewage utilities, treatment facilities, storm drainage utilities, communication utilities including cell towers, cabling, wireless communication

32
Q

CSI Master Format: Division 40

A

Division 40 — Process Integration

33
Q

CSI Master Format: Division 41

A

Division 41 — Material Processing and Handling Equipment

34
Q

CSI Master Format: Division 42

A

Division 42 — Process Heating, Cooling, and Drying Equipment

35
Q

CSI Master Format: Division 43

A

Division 43 — Process Gas and Liquid Handling, Purification and Storage Equipment

36
Q

Sheet designation G

A

G - General

37
Q

Sheet designation V

A

V - Survey mapping

38
Q

Sheet designation B

A

B - geotechnical

39
Q

Sheet designation C

A

c - civil

40
Q

Sheet designation D

A

D - process

41
Q

Sheet designation Q

A

Q - equipment

42
Q

Sheet designation W

A

W - distributed energy

43
Q

Sheet designation Z

A

Z - contractor / shop drawings

44
Q

Sheet numbering 0

A

0 - general, symbol legend abbreviations general notes

45
Q

Sheet numbering 4

A

4 - large scale drawings, not details

46
Q

Sheet numbering 5

A

5 - details

47
Q

Sheet numbering 6

A

6 - schedules and diagrams

48
Q

Cut heights often cut at

A

Cut heights often cut at 4’, but may vary to show elements above the cut plane.

49
Q

Deferred Submittal

A

Components of the building that are not submitted at the time of the the initial review and approval that will be submitted and reviewed within a specified time period.

50
Q

Examples of Common Deferred Approvals:

A
  • Elevators
  • Escalators
  • Fire Sprinklers
  • Prefabricated Elements (stairs with handrails and guardrails)
  • Curtainwalls
51
Q

ADS drawing organization

A
  1. General
  2. Hazardous Materials
  3. Survey/Mapping
  4. Geotechnical
  5. Civil
  6. Landscape
  7. Structural
  8. Architectural
  9. Interiors
  10. Equipment
  11. Fire Protection
  12. Plumbing
  13. Process
  14. Mechanical
  15. Electrical
  16. Distributed Energy
  17. Telecommunications Resource
  18. Other Disciplines
  19. Contractor/Shop Drawings
  20. Operations
52
Q

Quality Assurance

A

Relatively new concept in management practice

American Society for Quality (ASQ) Definition:

all the planned and systematic activities implemented within the quality system that can be demonstrated to provide confidence that a product or service will fulfill requirements for quality.

Assuring outcomes are desirable

Practice is confirmed by Quality Control checks

54
Q

Quality Management

A

Quality Planning - Educating your organization on quality standards applicable to that firm’s culture, and the processes established to produce work.

Quality Assurance - The application of processes during the design phase to ensure the product comes out of an acceptable (…hopefully exceptional!) level of quality.

Quality Control - Process involving the testing and inspection to determine its level of quality

Quality Improvement - Process that establishes practices for understanding feedback and lessons learned, and using that knowledge to enhance the quality of work in future projects.

55
Q

Quality Control

A

Traditional method of reviewing documents after design is completed

“Testing and inspecting”
Used to confirm quality assurance is followed/successful

In iterative design processes (repetitive work) this may be considered quality assurance for future projects

56
Q

master format mep meory trick

A

there is a FIRE (21 Fire Suppression)
Pull out the fire with WATER (22 Plumbing)
Dry the water with AIR (23 Heating, Ventilation & AC)
Wait a little bit… 24,

Now the CONTROL SYSTEM is back up 25
Now it is safe to turn on the LIGHTS again (26 Electrical)
Communicate to occupants that they can come back inside (27 Comm)

safety and security are resored(28)