Documentation Flashcards
What do reference noting systems do?
They enhance coordination between drawings and specifications.
Basic order of drawings in a set.
- Drawings that define symbols and abbreviations and contain General Information
- Site and landscaping drawings
- architectural drawings
- structural
- plumbing
- HVAC
- electrical.
SSASPHE
What is the difference between product data and samples?
Product data provide specific information about a product performance in charts, brochures, diagrams, or instructions.
Samples represent of materials color, texture, finish, workmanship, etc.
What does a project manual include?
Technical information, legal and procedural requirements… Including bidding documents, applicable contract forms, documents that relate to equal employment opportunity on labor wage requirements, etc.
What do the contract documents not include?
Bidding
What do the bid documents not include?
Contract modifications… But they do include contract forms and conditions of the contract
What do construction documents include? Six.
- Bidding requirements
- Contract forms
- conditions of the contract
- specifications and drawings
- addenda
- contract modifications
What comes between the landscape plan and the floor plan?
Demolition
Where does the foundation plan go?
In the beginning of the structural drawings
Divisions 1 through 16 are for…
Technical specifications
What are the three categories within the CSI masterformat?
Visions, sections, and parts
Many divisions are in the master format?
16
Within a division, a section describes…
The basic unit of work, such as a specific product your piece of equipment, and it’s installation.
For example, division nine, finishes, might include a section on gypsum drywall
What is in division 01 through division 10?
Division 01 – General requirements division 02 – existing conditions division 03 – concrete
division 04 – masonry
division 05 – metals
division 06 – wood, plastic, and composites
division 07 – thermal and moisture protection
Division 08 – openings
division 09 – finishes
Division 10 – specialties
What is division 12?
Furnishings
What is division 13?
special construction
What is division 11?
Equipment
What is division 14?
Conveying equipment
What is division 49, the last division?
Reserved
Who or what is responsible for dividing the work among sub contractors?
The general contractor, who is more aware with labor markets and union labor jurisdiction agreements
What is the purpose of a master specification?
A standard used to save time and reduce redundant work
What is the difference between text-based and knowledge-based master specifications?
Knowledge – based specifications usually dialogue method to access the data bases… While text – based systems are reductive, knowledge – based systems are additive.
What is the difference between closed and open proprietary specifications?
Closed specifications require a particular brand or tradename and do not permit substitution.
Open specifications name several (usually three) acceptable materials, products, or systems, and contractors may use any of them.
What are reference specifications?
They refer to quality standards a stab list by recognized testing authorities are by the federal government… They referred to minimum levels and are not appropriate or sufficient for the specific application
What do you have to put on a standard reference specification?
A date
______ specifications are the most detailed of all!
Descriptive
What are cash allowance specifications?
When an architect directs bitters to set aside a specified amount of money to be applied to the construction work at the architects direction… In Lieu of a specification
If the client has a piece of equipment or material, but the contractor is supposed to install it, what do you want to write on the specification?
Owner furnished – contractor installed
Went to clauses in the specifications conflict, which one prevails?
The more specific
Went to drawings conflict or are inconsistent, which one prevails?
The more recent… They were made on the same day, large scale detailed drawings will usually prevail over small-scale general drawings (this type of hierarchy can be made part of the construction contract by incorporation in the supplementary conditions)
Do you put quantities in the drawings?
No, you put them in the specifications
What are two ways to check a consultants work?
Review, or check it yourself
What is the definition of construction management?
Activities over and above normal architectural and engineering services, conducted during the pre-design, design, and construction phases, which contribute to the control of time and cost.
And does the CM join the project team?
During the design phases… He may later become the constructor
If the CM is an advisor, he asked is the owner’s agent and provide the owner with impartial technical advice. What is the appropriate AIA form?
Document B801 – CMa
Owner – construction manager agreement
If the CM is the constructor, there are two appropriate AIA forms…
Either:
Document A121/CMc
Or
Document A131/CMc
Why is an architect liable for his or her consultants work?
Because the architect is the prime professional under contract to the owner
Which contract specifically requires the consultant to be responsible for coordinating his or her own work?
The AIA architect – consultant agreement, document C-141