BALLAST Flashcards

1
Q

A rough structural wall may be out of plumb by as much as __ in a 10 foot height

A

1/4”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Which construction components allow some of the greatest tolerances?

A

Concrete footings… Up to 2 inches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is a bound book containing all contract and non-contract documents for a construction project, except the drawings?

A

A project manual

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

It is in a project manual (7)?

A
  1. Bidding requirements
  2. supplements to bid forms
  3. contract forms
  4. general and supplementary conditions
  5. general conditions of the contract
  6. supplementary conditions
  7. technical specifications
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Prescriptive specifications are also called…

A

Closed specifications… They tell the contractor exactly what brand and product to use

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is division 01 of the specifications?

A

General requirements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is division 02 of the specifications?

A

Existing conditions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is division 11 of the specifications?

A

Equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is division 13 of the specifications?

A

Construction… Security access, building automation, detection and alarm, fire suppression

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is division 03 of the specifications?

A

Concrete

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Specifications site and infrastructure subgroup is between divisions __ and __.

A

Division 30 – division 39

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Specifications process equipment subgroup is between divisions __ and __.

A

Division 40 – division 49

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Specification facility services subgroup is between division __ and division __.

A

Division 20 – division 29

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Specifications subgroup facility construction is between division __ and division __.

A

Division 02 – division 19

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is division 04?

A

Masonry

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is division 05?

A

Metals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What is division 06?

A

Wood, plastics, and composites

18
Q

What is division 07?

A

Thermal and moisture protection

19
Q

What is division 08?

A

Openings

20
Q

What is division 09?

A

Finishes

21
Q

What is division 10?

A

Specialties

22
Q

What is division 12?

A

Furnishing

23
Q

What is division 14?

A

Conveying equipment

24
Q

What is division 22?

A

Plumbing

25
Q

What is division 23?

A

Heating, ventilating, and air-conditioning

26
Q

What is division 26?

A

Electrical

27
Q

What is division 31?

A

Earthwork

28
Q

What is division 33?

A

Utilities

29
Q

What is the specifications division that includes items that are not standard and, like visual display boards, lockers, while in order cards, and access flooring? They are small relative to the building and there’s usually more than one of them installed.

A

DiVision 10, specialties

30
Q

What is the specifications division that includes items generally larger and more expensive than those in division 10? Like volts, tell her and security equipment, library commitment, theater and stage equipment, musical equipment… Athletic equipment, mortuary equipment etc.

A

DiVision 11, equipment

31
Q

Which is the division that includes much larger elements that can almost be thought of as a building within a building? Like air support structures, seismic control, and animal kennels?

A

Division 13, special construction… Clean rooms, sonnets, planetariums… Pre-engineered structures, hot tubs, and kennels

32
Q

What is the three-part format of a section within a division?

A

Part one, general
Part two, products
Part three, execution

33
Q

What is part one, general?

A

Scope of the section, submittals required, project conditions, etc.

34
Q

What is part two, products?

A

Details for the materials and products themselves, including acceptable manufacturers, standards and test methods

35
Q

It’s part three, execution?

A

How to install, apply… Establish quality control in the field, how to maintain, adjust, clean, protect

36
Q

What is a material safety data sheet?

A

Listing of product safety information prepared by manufacturers and marketers products containing toxic chemicals

37
Q

What is an exculpatory clause?

A

Tries to shift responsibility

38
Q

What is in the contract documents (7)?

A
  1. Owner-contractor agreement
  2. General conditions of the contract
  3. Supplementary conditions, if any
  4. Drawings
  5. Specifications
  6. Addenda
  7. Any modifications
39
Q

What is a contract modification?

A

Change order, construction change directive, written order issued by the architect for minor change, or written amendment to the contract signed by both parties

40
Q

What is project delivery?

A

Everything that happens until the client is handed his building

41
Q

Who are the three parties involved in the legal concept of agency?

A

The principal, the agent, and the third party… The owner is the principal, the architect is the agent, and the architect is the third-party Who is considered to be a vendor

42
Q

What is the difference between “multiple prime contract” and “many prime contract”?

A

“Multiple prime contract” – separated portions of the work, such as mechanical, electrical, and plumbing

“Many prime contract” – usually in fast track construction where one portion of the work needs to start before others