design for manufacture and project managament Flashcards
planning for accuracy and efficiency
effective research
allow to be tested again
clear list of the clients essential and desirable requirements
needs to be tested against specification
evaluated for suitability and the achievable level of accuracy
clear schedule with deadlines and clear QC
ensuring accuracy of prototype designs
heavily on a UCD approach with client feedback
pre production
- cad simulations, client feedback, peer review
production
- visual aesthetic checks, manufactured finish
ensuring accuracy jn small medium and large scale production
- CAD like simulation
- sample prototypes
- templates
- visual aesthetic checks
- machine maintenance and tool replacement
- manufactured finish
quality assurance
procedure and policies to reduce waste produced accurately within set acceptable tolerances
‘right first time and every time’
examples: sourcing materials with quality management standard, temp ranges
QC issues will decrease
CAD modelled to make sure they fit
FEA analyse the stresses in the working life
MFA check flow materials within moulding machinery
project management systems
total quality management
remove waste and produce products right first time
stems from QA
for continual improvement
communicate procedures and understanding is essential
project management systems
scrum
first used within software development
work in a team
achieve goals in short sprints
individuals feedback progress and issues
project management systems
six sigma
process improvement
minimise defects
reduce the number of defective products to less than 3.4 every million
define
measure
analyse
improve
control
project management systems
lean manufacture
reducing number of defective products through monitoring
systematic approach
elimante all waste
transport- reduce distance
inventory- reduce raw materials on site
movement- minimise movement
waiting- split evenly
over production- don’t over buy materials
over processing- don’t produce too many
defects- remove
critical path analysis
analyse all individual stages within a project
in time order
reoragamise ofer dependencies and structure the order
longest and shortest time path
quality control
monitoring testing checking materials
throughout the production process
- material checks- visual, chemical testing, colour matching
- dimensional accuracy- fit within set limits
- digital measuring devices- calliper +_ 0.02mm, interval sample testing
- go/no go gauge- fits within tolerance
- coordinate measuring machinery- range of pre defined measurements on finished components high accuracy
non destructive testing
internal structure of materials after joining processes
x-ray and ultrasound waves