Design, Economics and Cost Planning - Level 3 Flashcards
Talk me through when you’ve produced and presented a report advising on cost of a construction project.
Talk me through when you’ve produced and presented a report advising on schedule/completion time of a construction project.
Talk me through when you’ve produced and presented a report advising on the quality and buildability of a construction project in relation to cost.
Talk me through when you’ve evaluated building design efficiency.
Talk me through when you’ve assessed/evaluated market factors and trends in construction costs.
Talk me through when you’ve analysed the accuracy of predicted cost using benchmarking techniques.
Talk me through when you’ve carried out risk management on a cost plan.
Talk me through when you’ve carried out value engineering during cost planning and estimating.
Roughitts - What advice did you provide on the changes in design between the two cost analysis stages?
Roughitts - What level of inflation would you expect between the two estimates?
Clarendon Road - How did you compile your preliminary budget to support your clients decision making?
Clarendon Road - Why did you advise that lack of parking increase project costs?
Clarendon Road - What were the implications of site accessibility on costs?
Clarendon Road - Where did you collate location factor information from to support your benchmark adjustment?
Malton Way - What was the M&E provisional sum that you advised your client?
Malton Way - How did you allow for unknown factors?
What contingency did you include in addition to design contingency?