Design Economics and Cost Planning Flashcards
1
Q
What are the elements of an elemental Cost Plan?
A
- Building Works cost (Facilitating works and Building works)
- Contractor Preliminaries
- Contractor OH&P
- Professional fees
- Other project costs
- Risk
- Inflation
2
Q
What are the four types of risk included in a Cost Plan?
A
- Design development risks
- Construction risks
- Employer change risk
- Employer other risks
3
Q
Provide an overview of NRM
A
- 3 documents relating to measurement of building works
- Consist of:
- NRM 1 OCE and CP for capital building works
- NRM 2 Detailed messurement for building works
- NRM 3 OCE and CP for building maintenance works - Published by RICS
4
Q
What method of cost estimating would younuse in the earlier stages of design and how?
A
- Order of Cost Estimate
- Measured on a cost per m2 or unit basis
5
Q
What are the two types of inflation included in a Cost Plan?
A
- Tender inflation
- Construction inflation
6
Q
How is tender inflation calculated?
A
Period from estimate base date to date of tender return
7
Q
Hownis construction inflation calculated?
A
Period from the tender return date to the mid-point of construction period.
8
Q
How do you determine the rates for a particular element in your cost plans?
A
- Cost pricing books such as SPONS
- Contractor procurement packages in a two stage tender
- Contract sum analyses or Pricing Schedules
- Costs submitted in variations or CEQs
- Requesting quotations from suppliers