What are the advantages of MMC?
- Shorter construction period
- Increased quality due to offsite manufacturing and mass production
- Increased health and safety due to less sub-contractors on site
What are the advantages of a steel frame?
- Quick to erect
- Doesn’t require formwork
- High strength to weight ratio
- Good for spanning long distances
- Can be recycled
What are the disadvantages of steel frame?
- Fire treatment required
- Secondary steelwork needed for cladding
- Fluctuating price of steel
What kind of foundations would be needed for a low round bearing capacity?
- I would consult a structural engineer
- I would expect pile foundations
How did you cost the increase in acoustic performance of internal wall partitions?
To be confirmed
What is settlement?
The downward movement of a building caused by the weight compressing the soil beneath it.
What is beam and block flooring?
Concrete T beams and breaze blocks uniformly placed between them.
What’s the advantage of beam and block flooring?
- Good for poor ground conditions
- Ease of build due to repeated formation
What’s the advantage of beam and block flooring?
- Good for poor ground conditions
- Ease of build due to repeated formation
What are some sustainable technologies?
- Photovoltaics
- Rainwater harvesting
- Air Source Heat Pumps
- Green roofs
What are the different framing options for a new build?
- Steel
- Concrete
- Timber
What are the commercial differences between steel and concrete frames
- Steel has higher upfront and package costs but shorter programme
- Concrete has lower upfront costs but longer programme duration due to formwork
What are the BB guidance
Department for Education guidance around specifications for schools such as:
classroom sizes
fire safety
acoustic performance
ventilation, thermal comfort and air quality
In refurbishment projects what are the key things you need to consider
- Surveys including Refurbishment and Demolition survey
- Stripping out costs
- Whether or not new M&E systems are having to integrate with exisiting
- Wether or not the whole building/site is being refurbished and implication for area outside the red line boundary