Q

What are the advantages of MMC?

A
  1. Shorter construction period
  2. Increased quality due to offsite manufacturing and mass production
  3. Increased health and safety due to less sub-contractors on site
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the advantages of a steel frame?

A
  1. Quick to erect
  2. Doesn’t require formwork
  3. High strength to weight ratio
  4. Good for spanning long distances
  5. Can be recycled
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the disadvantages of steel frame?

A
  1. Fire treatment required
  2. Secondary steelwork needed for cladding
  3. Fluctuating price of steel
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What kind of foundations would be needed for a low round bearing capacity?

A
  1. I would consult a structural engineer
  2. I would expect pile foundations
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How did you cost the increase in acoustic performance of internal wall partitions?

A

To be confirmed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is settlement?

A

The downward movement of a building caused by the weight compressing the soil beneath it.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is beam and block flooring?

A

Concrete T beams and breaze blocks uniformly placed between them.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What’s the advantage of beam and block flooring?

A
  1. Good for poor ground conditions
  2. Ease of build due to repeated formation
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What’s the advantage of beam and block flooring?

A
  1. Good for poor ground conditions
  2. Ease of build due to repeated formation
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are some sustainable technologies?

A
  1. Photovoltaics
  2. Rainwater harvesting
  3. Air Source Heat Pumps
  4. Green roofs
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the different framing options for a new build?

A
  1. Steel
  2. Concrete
  3. Timber
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are the commercial differences between steel and concrete frames

A
  1. Steel has higher upfront and package costs but shorter programme
  2. Concrete has lower upfront costs but longer programme duration due to formwork
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the BB guidance

A

Department for Education guidance around specifications for schools such as:
classroom sizes
fire safety
acoustic performance
ventilation, thermal comfort and air quality

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

In refurbishment projects what are the key things you need to consider

A
  1. Surveys including Refurbishment and Demolition survey
  2. Stripping out costs
  3. Whether or not new M&E systems are having to integrate with exisiting
  4. Wether or not the whole building/site is being refurbished and implication for area outside the red line boundary
How well did you know this?