Construction Technology - Level 3 (Frames) Flashcards

1
Q

What where the various frame options you advised on on Lydden Road?

A

Steel Frame with Composite metal deck

Steel Frame with CLT slab

RC Frame with PT slab

RC frame with CLT Slab

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What was your advice to the Client on the different frame options for Lydden Road

A

Frame options were ranked from most cost effective to least cost effective

Key metrics were identified including:
Design efficiencies
Net:gross
Pros & Cons of each option

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What was the most cost effective frame option for Lydden Road?

A

RC frame with PT Slab = £73/ft² on the GIA

£4.8m total cost

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What was the least cost effective frame solution for Lydden Road?

A

Steel Frame with CLT Slab hybrid = £96/ft² on the GIA

£6.4m total cost

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What were some of the pros and cons you advised on the frame costs for Lydden Road?

A

RC frame with PT Slabs
Pros - most cost efficient
Cons - Thicker slabs than composite deck and reduced floor to ceiling

Steel with Composite deck
Pros - Wider spans with uninterrupted floor plates improved the NIA, lighter frame could result in reduced foundation costs
Cons - Not as cost effective as RC frame and PT slab and prices of steel being volatile

CLT Slab solutions
Pros - Increased sustainability credentials
Cons - Bespoke, most expensive solution and limited supply chain. Deep floor build ups reducing floor to ceiling heights

How well did you know this?
1
Not at all
2
3
4
5
Perfectly