Q
  1. Rosebank: Did you only consider one Architect?
A

Client instructed that they would be looking to appoint the build architect.

Client prepare scope; however, I assisted them by collating some of the other packages of record information they had not seen . Photographic records etc.

Brief i assisted with preparing for my client included exisiting scheme summary, and captured some of there requirements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  1. What was the Rosebank building clad in before? How were the brick slips being applied?
A

Fully clad in a timber product called Thermowood

I was only involved during inital feasibility and tender for PCSA. However, I understand brick slips can be applied using adhesive or mechanically or both.

Explored if able to use exisiting helping hand brackets and rail system timber evelope. Insulated backing board with chanells with teh correct mortor joint spacing for the brick

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Can you run me through what you’d consider typical elements of a substructure for a building of your choice.

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Can you run me though two types of modern methods of construction that you are aware of and the potential benefits each of them can bring to a construction project?

A

Volumeteric/Modular construction
Pods

Controlled factory conditons - not impacted by weather
Less material waste

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Can you run me though two types of modern methods of construction that you are aware of and the potential benefits each of them can bring to a construction project?

A

Volumeteric/Modular construction
Pods

Controlled factory conditions - not impacted by weather
Less material waste
Faster onsite assembly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

You have mentioned the RIBA Plan of Work in your summary, can you talk me through a couple of the changes from the 2013 to the 2020 version of the plan please?

A

Changes in some of the naming

more focus on BIM requirements and information exchanges

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Aside from foundation design, can you talk me some of the possible implications you can think of in relation to possible adverse outcomes to pre-construction surveys? Archaeology – delays? GI/SI – services/diversions etc.? Ecology – delays due to nesting/reptile seasons or requirements for works such as reptile fences?

A
Westhorpe - Ecology bats
TPO trees
Japanese Knotweed
Gasses in ground
Asbestos
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  1. L1 – Talk me though a few of the statutory and legislative standards in relation to construction technology that effect schemes you are working on. What effects have/may they have? Additional time and/or cost etc?
A

Building Regulations

British Standards - technical standards for products and services

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Are you able to confirm the specification and classification of the combustible cladding installed originally?

A
Thermowood cladding - class d
xtratherm PIR Phenolic board- class o
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Can you talk me through the main advantages of a brick slip external wall system when compared to other external wall solutions for both new build projects and retrospective refurbishment works?

A

less storage required than traditional brick
quicker to install
less raw materials used to produce/ more sustainable

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Can you talk me through the main disadvantages of a brick slip external wall system when compared to other external wall solutions for both new build projects and retrospective refurbishment works?

A

Skilled person to install
Easier to damage
Susceptable to defects if to bonded/fixed correctly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Talk me through your role and the input you provided at project design team meetings for Colville Phase 2C.

A

Gain better understanding of design to be able to prepare tender ER’s
Understand if on target with design programme to be able to review deleivery programme
Raise queries if design team steering away from clients brief
Allows me to discuss changes with the QS when updating the cost plan
Aware of VE
Include any project risks discussed on RR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Can you give me a couple of examples of different frame types you have experienced across the projects you have worked on and talk me through the reasons why these were the most appropriate solutions for those projects.

A

Most frames have been instu poured cast concrete slabs and coloums with either SFS lightweight steel or blockwork to form the external envelop. Aware other frames can be built from timber , steel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Can you give me a couple of examples of different foundation and frame types you have experienced across the projects you have worked on and talk me through the reasons why these were the most appropriate solutions for those projects.

A

Rosebank houses - traditional strip,

Colville - raft and piles (load and crossrail)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Give me a couple of examples of how you continually look to improve your construction technology skills.

A

Undertake CPD’s
Awareness of latest regulations - updates to part L
Participation at design meetings - asking specialists questions

17
Q

Covering both this competency and the sustainability competency also, can you give me a few examples of sustainability focused construction technology solutions have been applied to some of your projects

A
  1. HIU’s
  2. ASHP’s
  3. PV’s
  4. Pod construction - bathrooms