Pre-incident surveys and fire and life safety code enforcement inspections may both be conducted during a single visit if: (264)
required by the department.
Which of the following BEST describes the difference between pre-incident surveys and fire and life safety code enforcement inspections? (264)
Code inspections ensure buildings are up to code while pre-incident surveys assist fire fighting operations in the future.
Which of the following BEST describes why pre-incident surveys should not be conducted alongside inspections? (264)
Property management may not be as cooperative.
Building codes: (264)
define the type of construction used to build structures.
Which type of roof is commonly found on commercial buildings and may also support air-conditioning equipment? (265)
Flat
Which type of roof has a peak along one edge or in the center? (266)
Pitched
Which type of roof may use bowstring trusses as main supporting members? (267)
Arched
Which of the following is MOST likely to create a hazard by limiting access into a roof? (267)
Tongue and groove construction
Which of the following building components BEST describes what should be included in pre-incident surveys? (269)
Electrical systems
Assigning duties for unit members and ensuring availability of necessary survey documents are processes that should be completed: (269)
at the conclusion of the pre-incident survey
Which of the following is MOST likely to be an emergency response consideration for a pre-incident survey? (270)
What potential hazards to firefighter safety exist?
Which of the following people is MOST likely to schedule the pre-incident survey visit with the owner/occupant? (271)
Administrative staff
Field sketches for survey information records should be made showing the structure’s: (272)
size, location, and components
Which of the following is an area where a company office will MOST likely not be allowed to take photos or videos for a pre-incident survey? (272)
Proprietary area
Which of the following information about a building BEST describes what should be included in field sketches? (273)
The building’s dimensions