Chapter 6 - Aggregate Production Flashcards
What are the 3 ways to excavate rock from the heart of nature?
!) Rock Blasting
2) Cutting with Diamond wire saw
3) Jack Hammer
What is aggregate?
A proper mix of gravel, sand, and mineral filler in order to produce the concrete or asphalt
What construction projects do you think can use crushed rock?
Highway and Airfield base courses, drainage facilities, railroad truck, asphalt surface treatments, bedding for pipeline
What are the 4 steps of aggregate production?
1) Crushing
2) Sizing/Screening
3) Washing
4) Storage and Transport
Explain the difference between Jaw Crushers and Impact Crushers
Jaw Crushers are principally used as primary crushers
Impact Crushers include impact breakers, horizontal & vertical shaft impactors, hammermills, & limemills
Explain the difference between open and close circuit
Open Circuit: The process of crushing materials in a single pass
Closed Circuit: The process of crushing the same materials in more than one pass
How is the optimal screen area determined? (screen capacity)
1) Screen mesh size and its basic capacity
2) Position in the deck
3) Amount of oversize & half-size material
4) Shape
5) Weight factors
6) Material condition
What is the main reason for aggregate washing?
To get rid of undesired materials from the crashing. Removing silt, clay and organic material prior to processing and sorting.