Ch. 15 Plans Review and Field Verification Flashcards
On page 654 of Fire Inspection and Code Enforcement, if a system will be nonfunctional for any length of time, a ___ should be posted for the duration.
Fire watch
On page 656 of Fire Inspection and Code Enforcement, many plans review agencies publish a process guide that outlines the plans review process. The general steps of the process are:
- Application/Submittal
- Review
- Resubmittal
- Accept
- Authorize
Client’s written order to a contractor, issued after the execution of the construction contract, which authorizes a change in the construction work, project completion time, and or cost of the project is called what?
Change Order
On page 662 of Fire Inspection and Code Enforcement, the working drawing detail the design and building’s construction using four main views:
Plan
Elevation
Sectional
Detailed
Drawing containing the two dimensional view of a building as seen from directly above the area is called what?
Plan view
On page 663 of Fire Inspection and Code Enforcement, the site plan usually includes:
North direction symbol
Lot dimension
Utility lines
Structures to be removed
Contour lines
Fire apparatus access
On page 666 of Fire Inspection and Code Enforcement, interior compartment measurements made from the inside surface of one wall to the inside surface of the opposite wall is called what?
Clear dimensions
Vertical view of a building as if it were cut into two parts; intended to show the internal construction of each assembly is called what?
Sectional view
On page 680 of Fire Inspection and Code Enforcement, the first step in evaluating documents is to review the overall size of the building in terms of ____ and ____.
Height and Area