CE Specific Flashcards
competitive bidding
Usually results in the lowest construction cost
Create clearly defined guidelines that protect the owner from disreputable contractors and unethical bidding practices
value-based selection (VBS)
type of public bidding used in some jurisdictions that considers lowest cost as well as quality, schedule, and contractor personnel
negotiation (in design bid build)
The process in which the owner, with the assistance of the architect, works out a final contract price with on contractor
The contractor may be selected in one of two ways:
- Owner may already know which contractor they want to work with
- Owner may have selected several possible contractors for consideration. One is chosen based on qualifications after they are all interviewed.
prequalification of bidders
Prequalification is based on the following:
Financial qualifications
Personnel
Experience
References
Size of firm
Bonding capability
Special qualities that make them well suited for the project
Advertisement for Bids
Any contractor is able to submit a bid
Published in newspapers, trade journals, online, etc.
Usually written by the architect
Usually required for public work
Invitation to Bid
Contractor must be prequalified
Contains same info as an advertisement for bid
addendum
A written or graphic document, issued by the architect during the bid period prior to the execution of the contract, that modifies
or interprets the bidding documents by addition, deletion, clarification, or correction
Addendums are issued to bidders no later than four to five days before receipt of bid
Pre-Bid Conference
Architect and owner can emphasize important conditions
Very useful for renovation or addition projects
Large projects may have separate conferences for HVAC subs, electrical subs, etc.
Notes should be taken and distributed to bidders
What happens to bid received after the deadline?
must be returned unopened
How long after bid deadline is the decision typically made?
7-10 days
Who conducts most public bid openings?
Architect
What are the 4 options for the owner if all bids exceed the project budget?
Owner may rebid the project. Architect receives no additional compensation. Rebidding a project without changing its scope or details will rarely result in a cost reduction unless the marketplace/economy is changing rapidly.
Owner may authorize an increase in the construction cost and proceed.
Owner may work with the architect in revising the scope. Architect will receive no additional compensation to redesign and revise the documents.
Owner may abandon the project.
List 7 things typically included in the bid documents
The advertisement or invitation to bid
Instructions to bidders
Supplementary instructions to bidders (if any)
Bid forms
Bid security information
Performance bond, if required
Labor and material payment bond, if required
(also could include:
Qualification forms
Proposed subcontractor list form
Certificates of insurance
Certificates of compliance with applicable laws and regulations
Additional information available to bidders (such as geotechnical data) )
What AIA documents is the Instructions to Bidders
A701
substitutions (during the bidding process)
Bidder is required to submit a request for approval of a proposed substitution at least 10 days prior to the bid opening date
If approved, architect issues an addendum stating this and sends it to all bidders
Substitutions cannot be considered after the contract is awarded
bid security
Required to ensure that the successful bidder will enter into a contract with the owner
Could be a certified check, cashier’s check, or bid bond
If the successful bidder doesn’t enter into an agreement, the bid security may be retained to compensate for the difference
between the low bid and the next lowest
Amount could be fixed or percentage of bid, usually 5%
performance bond
A statement by a surety company that obligates complete construction of the project in the event that the contractor defaults on his
or her obligations
Surety company completes construction by hiring another contractor, or may supply additional money to the defaulting contractor to
allow construction to continue
Usually mandatory on public work and advisable on private work
Cost of the bond is paid by the owner and usually included in the construction cost
In CM as Adviser, who provides contract administration?
both architect and CM
In CM as Adviser, who prepares change orders and construction change directives?
CM
but they are signed by CM , architect, owner, and contractor
In CM as Adviser, who is the initial decision maker?
architect
What path doe RFI’s take in CM as Adviser?
Contractor - CM - Architect
CM gives their recommendation
What begins the construction phase in a CM as contructor project?
- the owner’s acceptance of the CM’s GMP proposal
- owner’s approval of the
CM’s control estimate - or the owner’s issuance of a notice to proceed
What is the purposed of architect’s site visits?
To endeavor to guard the owner against defects and deficiencies in the work
To determine if the work is progressing in such a way that it will be in accordance with the contract documents when
completed
If work on the construction site has to be uncovered and is found to be conforming, who pays for the uncovering?
the owner