Carpentry Flashcards
Drawings are referred to as -
BLUEPRINTS
A WINDOW LIST IS REFERRED TO AS _____
Schedule, it contains Information about size of rough openings
Batter Board
Is a board fastened horizontally to stakes where the corners of the building will be located - 244
USE OF SURVEYOR LEVEL
FIGURE 9-17 - 246
THE BEST METHOD TO ANCHOR SILL PLATES IS TO USE
ANCHOR - 268
DECAY RESISTANT WOODS
BLAD CYPRESS, REDWOOD, CEDAR - 329
THE CORNER OF A WOOD FRAME STRUCTURE IS SERVING AS A
SHEAR WALL - 378
____ FOUNDATION WALL CLEARANCE AT END OF GIRDER
1/2” - FIG. 15-5, 399
THE WOOD FRAMING COMPONENTS AROUND A CHIMNEY FOUNDATION ARE -
TRIMMERS, HEADERS, AND TAIL JOIST - 412
___GAP BETWEEN OSB SHEETS
1/8” - 421
WHEN THE FRAME OPENING SPAN IS MORE THAT ___, USE TWO JACKS
6’ - 434
TRUSSES CARRY ROOF LOAD ONLY IN
VERTICAL POSITIOIN - 495
DRYWALL SHOULD BE MOUNTED ______ WITH DOOR JAMB
FLUSH - FIGURE 21-5
A ROUGH OPENING IS ___ WIDER THAN DOOR
2” - 618
ONE SQUARE OF ____ POUND SHINGLES COVERS ___ SF OF ROOF
235#, 100 - 626