Call For Fire Flashcards
Coordinated efforts of acquisition resources, fire cells, attack and delivery systems
Fire Support System
Rapid and continuous integration of surface to surface indirect fires, target acquisition, and other lethal/non-lethal attack systems
Fire Support
Fire Support System Components
- Target Acquisition (Observer)
- Fires Cell (Fire Direction Center)
- Firing Elements (Shooter)
Observer Duties
Provide surveillance data and accurately locate indirect fire targets
What 2 things do radar systems provide?
- Point of Origin
- Point of Impact
Fire Direction Center Duties
- Receive calls for fire
- Determine how to attack
- Determine firing data
- Send fire order
Firing Elements
- Receives data from FDC
- Fires the weapon and puts steel on target
Benefits of Aviation forces in defense
- Mobility
- Speed
- Versatility
Maneuver Commanders most reponsive indirect fire source
Mortars
Six elements of Calls For Fire
- Observer ID
- Warning Order
- Target Location
- Target Description
- Method of Engagement
- Method of Fire and Control
Standardized request for fire
Call For Fire
Clears the net for fire mission
WARNO
Types of Missions
- Adjust Fire
- Fire For Effect
- Suppression
- Immediate Suppression
- Immediate Smoke
Methods of Target Location
- Grid (Default)
- Polar (Observer Location Required)
- Shift from Known Point
Will be used when you do not have an accurate target location
Adjust Fires
When observer is certain that target location is accurate and requires little to no adjustment
Fire For Effect
Normally fired on planned targets; not active
Suppression
When engaging a planned target or target of opportunity
Immediate Suppression / Smoke
Critical to achieving first round effects on targets
Target Location
Last Mandatory Element of Call For Fire; Length, Width, Attitude
Target Description
6 Parts of Method of Engagement
- Type of Adjustment
- Trajectory
- Ammunition
- Distribution
- Danger Close
- Mark
Target that is less than or equal to 200m in width and length
Point Target
Standard (Circular) Sheaf
100m Radius
Linear Sheaf
Length > 200
Width <= 200