Building Pathology Flashcards
45 Cullen St. What are obligations under building regulations when replacing roofs?
- Building control application required if more than 50% of the surface of the individual thermal element is renovated.
- Ensure thermal insulation is sufficient by upgrading.
45 Cullen St. Why did you advise replacing the cold roof with a warm roof?
Reduced risk of condensation and improved energy efficiency and energy bills.
45 Cullen St. What additional benefits did you mention about implementing the warm roof system?
Reduced risk of condensation and improved energy efficiency and energy bills.
45 Cullen St. How did you explain that the proposed warm roof system would satisfy Part L?
Insulation placed
between and over
joists as required to
achieve the target
U-value
45 Cullen St. What U-Value did you need to achieve?
0.16 W/m2K as per Appendix C Table C1 AD L.
What is a U-Value?
A measure of the ability of a building
element or component to conduct heat from a warmer environment to a cooler environment. It is expressed as the quantity of heat (in watts) that will
flow through 1m2 of area divided by the difference in temperature (in degrees K) between the internal and external environment. The unit is W/(m2K).
45 Cullen St. Did you take a core sample of the roof?
I asked a roofing contractor to carry out this task and it was confirm there was no insulation and timber roof deck.
45 Cullen St. Why was a liquid applied system not applicable?
The roof replacement was simple with no plant or penetrations. Felt was the favoured option and generally more cost effective, especially on a domestic property.
18 Noel St. Explain the rationale behind advising the use of lime in the mortar mix.
Due to being Victorian soft bricks specified 1:3 / NHL 3.5.
18 Noel St. What internal recommendations were made to address the dampness issue?
Ready mixed lime mortar at a ratio 1:3. Lime puty:Sharp Sand.
18 Noel St. How did you Identify the DPC?
Wider mortar joint at the base of the wall.
18 Noel St. What type of DPC was It?
Slate
18 Noel St. If they continued to report damp issues despite implementing your advice, what additional steps would you recommend?
Advice that it can take many months for the wall to dry out. Heat the property.
18 Noel St. Why did you recommend a French drain as well as guttering?
To allow rainwater to be directed away from the bay effectively and for water to evaporate from the ground.
67 Holmes - How were moisture readings recorded and mapped?
Sketch of the wall including skirting, readings taking from moisture meter at different levels using a rule.
67 Holmes - How was advice provided to address the condensation-related issues?
Improved ventilation and heating. External repairs. Replacement of plaster, wallpaper and skirtings.
67 Holmes - How could the ventilation be Improved?
Mechanical and natural i.e. trickle vents to windows.
67 Holmes - What could be causing the condensation?
Poor ventilation and heating in the property. Cold bridging and poor building performance.
67 Holmes - What are long term effects, if the Issue Is not resolved?
Deterioration of the building and harmful to health for the tenant.
St Hugh’s - What repair methods could be used?
Indent repairs to sandstone and re-pointing with lime mortar.
St Hugh’s - Did you recommend any actions or solutions to address the issues identified with the mortar?
Yes, I recommended rake out and re-point.
St Hugh’s - What mortar would you expect or use when repairing?
1:3 Lime (non-hydrated):Sand
Four main stages of identifying and remedying building defects?
Inspection – A stringent
inspection process will identify clearly visible and less visible defects within a
building’s fabric.
Diagnosis – This is the second stage and it is essential for the Building
Surveyor to have knowledge and experience with regard to the wide range of various diagnoses for any given defect. This is effectively what is wrong with
the building and why. It is important to understand that there may be a
number of contributory factors to any one defect.
Prognosis – This stage involves predicting the consequences of not dealing
effectively with the defect and the likely short and long term implications to the
building in question.
Remedy / Remedial action – This is final step in rectifying the issue(s) in
hand and will form a key part of the recommendations of your findings to the
client. Building Surveyors may be required to recommend alternative
solutions, depending on cost and building longevity requirements.
Limitations of a moisture meter?
Calibrated to timber, salts can trigger the meter and give false readings. Foil backed plasterboard can also provide false readings.
- Typically, readings of up to 18% moisture in timber are acceptable
(dependent upon relative humidity of surroundings) - Brickwork is considered wet at 5% and saturated at 10%
- Plaster is dry at 1% and saturated at 5%
*
Note: Readings above are based on the difference between wet and dry
weight and not damp meter readings which can be misleading unless the
readings are understood and interpreted correctly.