Q

What is the climate zone in Melbourne?

A

6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the minimum concrete coverage for bottom reinforcement to ground for a slab?

A

40mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the minimum bearing pressure on an edge beam?

A

50kPa

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the minimum overlap for cypress weatherboards?

A

30mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How much ventilation is required for a bathroom?

A

5% of floor space

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The minimum required width of a landing?

A

750mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

If using footing type 5 as per 1684, what is minimum kPa requirement?

A

125kPa

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the minimum clearance from the top of a window to the U/S of a window head or lintel

A

15mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What % of building does temporary bracing need to be?

A

60%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Maximum spacing of an internal beam from an external corner?

A

4.0m

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the maximum spacing for articulation joints for wall with less than 900mm x 900mm?

A

6.0m

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Under what circumstances can the owner exit the contract if the build exceeds what amount of time?

A

1.5 times the construction period

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Maximum turn-up on a frame for DPC is?

A

150mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How far away from a pool fence can a step be?

A

500mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Once a permit is received how much time do you have to complete building work on a swimming pool?

A

6 months

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How can you terminate the appointment of a building surveyor?

A

Written authority from VBA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is a form 17

A

Certificate of final inspection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Why is a cash flow budget important?

A

To work out what cash position your company is in

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Once capacity to pay is requested, how many days does the owner have to supply evidence?

A

7 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Liabilities is defined as?

A

Obligations the company must pay

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the minimum amount of public liability required to enter into a contract?

A

10 million

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

A crack in concrete floor is considered severe when?

A

Crack width exceeds 4mm -10mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What is the maximum size hole you can drill into a load bearing wall?

A

25mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What is the maximum a stump can be out of plumb if it is 1.0m or less?

A

10mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
What 3 component make up FRL?
Structural adequacy, Integrity, insulation
19
Combined counter strutting beam size if CCSB span is 3430mm, hanging beam span 4580mm using F8 with a sheet roof? A 225 x 75mm B 250 x 75mm C 277 x 75mm D 300 x 75mm
20
Minimum and maximum number of risers in a staircase?
Minimum 2 Maximum 18
21
AS for glazing
AS 1288
21
Minimum concrete coverage amounts for reinforcements at the top and bottom of a strip footing?
40mm
22
Over what height do stumps need to be braced for a clad frame house with a full perimeter masonary base?
1200mm
22
Gap from pool fence to natural ground?
100mm
23
The maximum vertical spacing of brick ties at an articulation joint?
300mm TO BE CONFIRMED
23
What is the minimum clearance from a bottom chord of a truss to an internal wall?
10mm
24
How much tolerance is allowed for a truss to be out of plumb?
50mm or H/50, whichever is less
24
How is stump embedment measured?
.3 stump above ground or 450mm whichever is greater
25
What size gap is required for caulking at the bottom of a WR wall lining and the shower base?
6mm
26
Cancellation of registration is which form?
Form 21
27
How many days does an adjoining owner have to respond to protection works notice.
14 days
28
Masonary walls are considered defective if they are how far out of plumb?
25mm over the height of the building
28
Client can exit contract if the price exceeds how much?
15% of total contract price
29
Maximum deviation out of plumb for a stump 2m or less?
Length of stump divided by 100
29
What is the maximum clearance from finished floor to the bottom?
20mm
29
In what order would you follow for waterproofing process
Prep, prime, bond breaker, waterproof
30
The highest step you can work on a ladder is?
2nd tread from the top
31
What would be the joist size for a continuous span F17 at 450mm spacings and spanning 1720mm? A 70 x 32mm B 90 x 35mm C 120 x 35mm D 140 x 35mm
32
What is classified as a 10b building
Swimming Pool
33
Whas is the maximum length of a slab before a control joint is required as per NCC 2022?
18m
33
For a sloping site, how much is the sub floor clearance measured from external walls?
150mm - 400mm over 2m
34
Minimum splice for trench mesh?
500mm
35
How much natural light is required from a window?
10% of floor area
35
Maximum spacing for downpipes is how much?
12m
36
What is the maximum notch in a stud for a bath?
25mm
37
If openings of more that 900mm x 900mm occur, what becomes the maximum spacing for articulation joints?
5000mm
38
How far offset from an internal beam can an internal loadbearing wall be on a slab?
1000mm
39
When fixing DPC to the frame, what is the maximum spacing foe fixings?
Every second stud CHECK THIS
40
What does NCZ 5 relate to?
If a pool fence intersects a boundary fence, the pool fence needs to be 1.8m high over the 1st 900mm
41
AS3470 relates to?
Waterproofing internal areas
42
What is the recommended height difference between external and internal walls as per AS4440 A Ceiling batten depth + 10mm B 10mm C Ceiling batten depth + 15mm D Ceiling batten depth + 20mm
43
What is the AS for installation of roof trusses A AS4773 B AS3740 C AS4440 D AS3660
C AS4440 CONFIRM
44
What is a building order?
Stop works notice from surveyor to rectify defective building work
44
Once all necessary info has gone to surveyor to obtain a building permit for Class1 and 10 building, how many days to issue the permit? A 1 Day B 7 Days C 4 Days D 21 Days
45
What form is a Building Permit? A Form 1 B Form 2 C Form 3 D Form 4
46
What are the deposit %'s for contracts under and over $20,000
10% under $20k 5% over $20k
46
How many days does a builder have to give a commencement notice to the owner? A 7 days once work commences B 1 day once work commences C 5 clear business days once work commences D 14 days once work commences
47
What are liquidated damages defined as?
Pre-agreed amount between the owner and builder that kicks in if the job completion is delayed.
48
What is working capital?
Make sure you have the right amount of cash at the right time
48
What form needs to be signed when using a method B contract
Form 1 change of legal rights
49
FFL is defective if it deviates more than how much from the documented height? A 30mm B 40mm C 50mm D 60mm
50
The nominal thickness for brick perps is how much? And how much can they deviate?
10mm nominal & +/- 5mm
51
What is the maximum nail spacing to comply with a type A plybrace? A 300mm outside edges & 150mm intermediately B 150mm outside edges & 300mm intermediately C 200mm outside edges & 200mm intermediately D 100mm outside edges & 300mm intermediately
52
How soon after completion of works must a plumber supply a Compliance Certificate