Available to promise and transfer of requirements Flashcards
Material Determination
Method in SAP SD to determine the material to be used in the sales order.
Uses the condition technique to substitute on material in the sales order for another when certain conditions are met
Triggered by the material entered in the line item of the sales order.
Material Determination 2
Sometimes referred to as product selection and can be automatic or manual.
Material Determination 3
Begins by defining the condition type which is the same as defining the material determination
Defining Access sequence
Sequence of steps that the system follows in sequential order to obtain a condition record.
Access sequence must exist before you can assign it to a condition type.
Access number is the order in which the system will read the access sequence.
Condition tables
A tabulated combination of fields.
Determination Procedure
When a sales order is created and the determination procedure is accessed, the procedure then calls the condition types in sequence. The condition types then each individually calls the access sequence and subsequently calls the condition tables, which the system then checks to see if a valid condition record exists.
Determination Procedure 2
By assigning the material determination procedure to the sales document type, you are activating material determination.
A substitution reason, a rule that controls the material determination’s execution.
Material Listing and Exclusion
Used to list the products or services specific customers may or may not purchase.
Uses the condition technique to determine its values and procedure.
It applies to two partner functions in Sales and distribution: the Sold-to Party and the payer.
Condition Technique configuration
- Put the fields you will need into the field catalog
- Creation the condition tables you will need
- Create the access sequence you will need.
- Assign the condition tables to the access sequence
- Create the condition types.
- Assign the access sequence to the condition types 7. Create the determination procedure (if necessary) and assign the condition types to it.
- Assign the determination procedure
- Lastly, create your condition records.
Materials Requirements Planning and Transfer of requirements
Customer’s requested delivery date and quantity to be delivered is transferred (transfer of requirements) to materials requirements planning (MRP).
MRP determines if there is enough quantity of stock available for the scheduled delivery date.
Closely integrated with the materials management and production planning modules.
Schedule lines in the sales order transfer the requirements through to MRP.
Individual or Collective Requirements
The transfer of requirements can either be a transfer of requirements with an individual requirement or a transfer of requirements with collective requirements.
This is set up in the “availability check” field in the material master record
Individual requirements
individual transference of demand to MRP for each schedule line.
Advantage is that you can use the “availability overview”(a screen) can show you individual aspects (order quantity, sales document number, item number and requirement class of the schedule line.
The view for the availability overview is configured using checking groups
Collective requirements
Collective grouping of requirements created either daily or weekly and transferred to MRP.
The documents created in collective requirement processing cannot be individually identified from the availability overview.
Advantage, allows businesses with very large volume to have a clearer view from the availability overview.
The system will automatically create individual requirements for materials with collective requirements indicated on the material master for transactions that create special stock.
Transfer of Requirements
The same control elements used for availability check are used for the transfer of requirements.
Dependent on the following data
- Requirements type
- Requirements class (key factor), based on the requirements type for the sales document
- Checking group
- Schedule line category
Criteria for transfer of requirements to be carried out
- Plant must be assigned to the sales document line item level
- Schedule line category must be switched on for transfer of requirements
- Transfer of requirements must be switched on at the requirements class level
- Checking group must be defined and allocated to the material master record in the Sales: General/Plant view in the availability check field.
Availability check
shows the confirmed quantities at schedule line level
Passing on of requirements
Shows the ordered quantity (passing on of the demand)
Consumption Modes
Defines whether, and in which direction on the time axis from the requirements date the consumption of customer requirements with planned independent requirements should occur. The requirements date corresponds to the date the sales order items were created.
Consumption Modes Options/Forwards or Backwards scheduling
- No planning consumption
- Backwards consumption only, starting from the requirements date, backwards consumption is carried out within the relevant consumption period
- Forwards consumption only, starting from the requirements date, forward consumption is carried out within the relevant consumption period.
- Backwards/forwards consumption, Starting from the requirements date, backwards consumption is performed first of all. Then, if no planned independent requirements can be allocated before the requirements date, forward consumption is performed. Both procedures are carried out for the relevant consumption period.
- Forwards/backwards consumption, Starting from the requirements date, forward consumption is performed first of all. Then, if no independent requirements can be allocated after the requirements date, backwards consumption is performed. Both procedures are carried out for the relevant consumption period.
Planning materials
You can have a common planning material and assign similar materials to it.
Independent requirements are created for the planning material to cover the requirements that are expected for the materials assigned to the planning material. So the customer requiremetns for the similar materials are consumed by the independent materials of the planning material.
You assign the planning material to the materials in MRP 3 screen.
You also need to enter the “strategy group” for planning uisng the planning materials on the MRP 3 screen
You can’t use a transfer of requirements on sales or delivery documents when using a planning material. The actual requirement from the sales or delivery documents consumes the independent requirement of the planning material. The independent requirement is reduced. Then the MRP runs, requirements are created for the order or delivery, and the balance of the independent requirement is reduced.
Stock Overview
A view of stock and situation of stock levels in a plant
*insert pic*