AIA Document A701-2018 Exam Flashcards
1
Q
- Written or graphic instruments used by the architect prior to the execution of the contract
which modify
or interpret the bidding documents by additions, deletions, clarifications or corrections are
referred to as
.
A. Amendment
B. Change order
C. Change directive
D. Addenda
A
- D 1.3
2
Q
- A bidder by making a bid represents that .
A. The bid is based on materials required by the bidding documents with exceptions
B. Bidder has posted a letter of credit
C. The bidder has visited the site
D. Bidder has general liability insurance
A
- C 2.1
3
Q
- A deposit may be required from a bidder who obtains complete sets of bidding documents from the
issuing office. The deposit will be refunded to bidders who submit a bona fide bid and return the
bidding documents in good condition within days after receipt of bids.
A. 5
B. 10
C. 15
D. 30
A
- B 3.1.2
4
Q
- Bidders and sub-bidders requiring clarification or interpretation of the bidding documents shall make a
written request which shall reach the architect at least days prior to the date for receipt
of bids.
A. 7
B. 14
C. 21
D. 30
A
- A 3.2.2
5
Q
- Interpretations, corrections and changes of the bidding documents will be made by .
A. Addendum
B. Change directive
C. Change order
D. Amendment
A
- A 3.2.3
6
Q
- No substitution for materials, products or equipment will be considered prior to receipt of bids unless
written request for approval has been received by the architect at least days prior to the
date for receipt of bids.
A. 30
B. 15
C. 10
D. 5
A
- C 3.3.2.1
7
Q
- All copies of the bid, the bid security, if any, and other documents required to be submitted with the bid
shall be enclosed in a sealed, envelope.
A. Transparent
B. Opaque
C. Red
D. Blue
A
- B 4.3.2
8
Q
- Oral, telephonic or telegraphic bids are and will not receive consideration.
A. Invalid after 3 days
B. Valid for 24 hours
C. Invalid after 5 days
D. Invalid
A
- D 4.3.5
9
Q
- At the discretion of the owner, if stipulated in the advertisement or invitation to bid, the properly
identified bids received on time will be opened and will be read aloud.
A. Publicly
B. Privately
C. After 3 days
D. After 24 hours
A
- A 5.1
10
Q
- The owner shall, at the request of the bidder to whom award of a contract is under
consideration and no later than days prior to the expiration of the time for withdrawal of bids, furnish to the bidder reasonable evidence that financial arrangements have been made to fulfill the owners
obligations under the contract.
A. 30
B. 21
C. 14
D. 7
A
- D 6.2
11
Q
- If the bidding documents require either a performance bond or a payment bond, the cost shall
.
A. Not be included in the change order
B. Be included in the change order
C. Be added later to the bid in determining the contract sum
D. Be included in the bid
A
- D 7.1.2
12
Q
- The bidder making a bid represents that he or she .
A. Is familiar with local conditions under which the work is to be performed
B. Is making a bid contingent on standard codes and conditions
C. Will adjust accordingly if the bid is accepted as long as an addendum is made
D. Will provide specifications for all materials
A
- A 2.1
13
Q
- The proposed contract documents consist of .
A. The form of agreement between the owner and the contractor and instruction to bidders
B. The conditions of the contract (general, supplementary and other conditions), drawings,
specifications and all addenda
C. Advertisement or invitation to bid, instructions to bidders, the bid form, and other sample
bidding and contract forms
D. All addenda or written, graphic instruments issued by the Architect prior to the execution of
the
contract
A
- B 1.1
14
Q
- A contractor furnished a bid on a project according to the provisions of AIA Document A701. The bid
was received and accepted by the owner after the designated time and date required on the bidding
documents for the receipt of all bids. The bidding documents required that the contractor furnish a
performance bond and a payment bond. The contractor did not furnish a performance bond and a
payment bond and, also refused to enter into a contract with the owner and withdrew the bid. The
damages, if any, that can be assessed against the contractor by the owner are .
A. No penalty. A contractor can withdraw a bid at any time he/she chooses
B. The amount of bid security shall be forfeited to the owner as liquidated damages, as a penalty
C. A penalty equal to 2.0% of the bid price
D. The amount of bid security shall be forfeited to the owner as liquidated damages, not as a
penalty
A
- D 4.2.2
15
Q
- An architect has issued addenda prior to bid due date. According to AIA Document A701, the architect
must issue all addenda at least days prior to date for receiving all bids.
A. 4
B. 6
C. 8
D. 10
A
- A 3.4.3
16
Q
- The burden of proof of the merit for any proposed substitution of materials, equipment or
products in the bidding documents is upon the
.
A. Architect
B. owner
C. Proposer
D. Supplier
A
- C 3.3.3
17
Q
- During the bidding process, where there is a discrepancy in the drawings or specifications, any
corrections shall be made by .
A. Instructions to bidders
B. Addendum
C. Change order
D. Change directive
A
- B 3.2.3
18
Q
- A bidder discovers that there is a discrepancy between the plans and the specifications. The
bidder
should .
A. Report it to the owner within seven days written notice
B. Talk to the other bidders
C. Ignore it
D. Report it to the architect immediately
A
- D 3.2.1
19
Q
- Any performance bond or payment bond required in the bidding documents shall be delivered by
the bidder to the owner not later than days following the date of execution of the contract.
A. 3
B. 5
C. 7
D. 10
A
- A 7.2.1
20
Q
- The owner must prove financial capability no later than days prior to the expiration of
the time for withdrawal of bids.
A. 3
B. 5
C. 7
D. 30
A
- C 6.2
21
Q
- Any changes or corrections of the bidding documents must be made by the .
A. General contractor
B. Addendum
C. Certified mail
D. Phone call
A
- B 3.2.3
22
Q
- AIA bids are received .
A. In a sealed envelope
B. By phone — bidder to contractor
C. In a legal-size envelope
D. All of the above
A
- A 4.3.2
23
Q
- The bidder shall deliver the required bonds to the owner not later than days following
the
date of the execution of the contract.
A. 1
B. 3
C. 5
D. 7
A
- B 7.2.1
24
Q
- The owner shall, at the request of the bidder to whom the award of a contract is under
consideration,
furnish reasonable evidence that financial arrangements have been made to fulfill the contract
within
days prior to expiration of the time for withdrawal of bids.
A. 3
B. 4
C. 7
D. 10
A
- C 6.2
25
Q
- Bidders and sub-bidders requiring clarification of the bidding documents shall make a written
request to
the architect at least days prior to the date for receipt of bids.
A. 3
B. 5
C. 7
D. 10
A
- C 3.2.2