3M Program Management Flashcards
NAVSEAINST 4790.8
Ship’s Maintenance and Material Management 3-M Manual
PMS Manual
-contains (LOEP’s), (MIP’s) and (MRC’s) that apply to the work center
LOEP
(List of Effective Pages)
listing of the Maintenance Index Pages (MIPs) and system equipment not requiring PMS assigned to each Work Center
MIP
(Maintenance Index Page)
Identifies the system, subsystem, or component involved and gives a brief description of each maintenance requirement
MRC
(Maintenance Requirement Card)
explains how to perform the maintenance task in terms that everyone should understand and list tools and materials needed for the job
FBR
(Feedback Report)
Notify Fleet Technical Support Centers on PMS matters
3 Types: A, B, Urgent
CAT A: non-technical
CAT B: technical
Urgent: safety of personnel, ship, equipment
Periodicity Codes
D-daily W-weekly M-monthly Q-quarterly S-semiannually A-annually R-situational U-unscheduled LU-lay up PM-periodic maintenance SU- start up
Schedules of maintenance
Cycle, Quarterly, and Weekly
IDENTIFY the purpose of 3-M Program
designed to provide for managing maintenance and maintenance support to help achieve maximum equipment operational readiness
Objectives of 3M:
DOC-umentation C-onfiguration A-nalysis S-tandardization E-fficiency S-cheduling
The ship’s 3-M system applies to:
all ships, service craft, small boats, and non-aviation fleet test and support equipment
The ship’s 3-M system does not apply to:
- nuclear propulsion plants
- fleet ballistic missile systems
- aeronautical support equipment
Who is overall responsible for ensuring ship maintenance is accomplished
Commanding Officer
3-M system manager
Executive Officer
3-MC
ship’s subject matter expert in all aspects of the 3-M system
Who is responsible for the 3-M system within the department?
Department Head