3.5 "Emergency Core Cooling System" Flashcards
LCO 3.5.1 title
Safety Injection Tanks
LCO 3.5.1 requirement
4 SITs shall be operable
LCO 3.5.1 applicability
Modes 1 and 2
LCO 3.5.1 required actions < 1 hour
2 or more SITs inoperable, then enter LCO 3.0.3 immediately
LCO 3.5.2 title
ECCS - Operating
LCO 3.5.2 requirement
2 ECCS trains shall be operable
LCO 3.5.2 applicability
- Modes 1 and 2
- Mode 3 with PCS temperature >= 325 F
LCO 3.5.2 required actions < 1 hour
Less than 100% of the required ECCS flow available, then enter LCO 3.0.3 immediately
LCO 3.5.3 title
ECCS - Shutdown
LCO 3.5.3 requirement
- 1 LPSI train shall be operable
- A LPSI train may be considered operable during alignment and operation for SDC if capable of being manually realigned to the ECCS mode of operation
LCO 3.5.3 applicability
- Mode 3 with PCS temperature < 325 F
- Mode 4
LCO 3.5.3 required actions < 1 hour
Required LPSI train inoperable, then initiate action to restore one LPSI train to operable immediately
LCO 3.5.4 title
SIRWT
LCO 3.5.4 requirement
The SIRWT shall be operable
LCO 3.5.4 applicability
Modes 1-4