3.4 "Primary Coolant System" Flashcards
LCO 3.4.1 title
PCS Pressure, Temperature, and Flow Departure from Nucleate Boiling Limits
LCO 3.4.1 requirement
PCS DNB parameters for PZR pressure, cold leg temperature, and PCS total flow rate shall be w/in the limits specified in the COLR
LCO 3.4.1 applicability
Mode 1
LCO 3.4.1 required actions < 1 hour
NONE
LCO 3.4.2 title
PCS Minimum Temperature for Criticality
LCO 3.4.2 requirement
Each PCS loop average temperature shall be >= 525 F
LCO 3.4 2 applicability
- Mode 1
- Mode 2 with Keff >= 1.0
LCO 3.4.2 required actions < 1 hour
Tave in 1 or more PCS loops not w/in limits, then be in Mode 2 with Keff < 1.0 w/in 30 minutes
LCO 3.4.3 title
PCS Pressure and Temperature Limits
LCO 3.4.3 requirement
PCS pressure, temperature, and heatu/cooldown rates shall be maintained w/in the limits of Figure 3.4.3-1 and 3.4.3-2
LCO 3.4.3 applicability
At all times
LCO 3.4.3 required actions < 1 hour
- Requirements of LCO not met in Modes 1-4, then restore parameter(s) to w/in limits in 30 minutes
- Requirements of LCO not met any time in other than Modes 1-4, then initiate action to restore parameter(s) to w/in limits immediately
LCO 3.4.4 title
PCS Loops - Modes 1 and 2
LCO 3.4.4 requirement
2 PCS loops shall be operable and in operation
LCO 3.4.4 applicability
Modes 1 and 2
LCO 3.4.4 required actions < 1 hour
NONE
LCO 3.4.5 title
PCS Loops - Mode 3
LCO 3.4.5 requirement
- 2 PCS loops shall be operable and 1 PCS loop shall be in operation
- All PCPs may not be in operation for <= 1 hour per 8 hour period provided no operations are permitted that would cause reduction of PCS boron concentration AND core outlet temperature is maintained at least 10 F below saturation temperature
- Forced Circ (starting the 1st PCP) shall not be initiated unless PCS Tc is > 430 F, S/G secondary temperature is <= reactor inlet temperature (Tc), S/G secondary temperature is < 100 F above Tc and SDC is isolated from the PCS and PCS heatup/cooldown rate is <= 10 F/hour, OR S/G secondary temperature is < 100 F above Tc and SDC is isolated from the PCS and PZR level is <= 57%
LCO 3.4.5 applicability
Mode 3
LCO 3.4.5 required actions < 1 hour
No PCS loop operable OR no PCS loop in operation, then suspend all operations involving a reduction of PCS boron concentration AND initiate action to restore 1 PCS loop to operable and in operation immediately
LCO 3.4.6 title
PCS Loops - Mode 4
LCO 3.4.6 requirement
- 2 loops or trains consisting of any combo of PCS loops and SDC trains shall be operable, and either 1 PCS loop shall be in operation or 1 SDC train shall be in operation with >= 2810 gpm flow through the reactor core
- All PCPs may not be in operation for <= 1 hour per 8 hour period provided no operations are permitted that would cause reduction of PCS boron concentration AND core outlet temperature is maintained at least 10 F below saturation temperature
- Forced Circ (starting the 1st PCP) shall not be initiated unless S/G secondary temperature is <= reactor inlet temperature (Tc), S/G secondary temperature is < 100 F above Tc and SDC is isolated from the PCS and PCS heatup/cooldown rate is <= 10 F/hour, OR S/G secondary temperature is < 100 F above Tc and SDC is isolated from the PCS and PZR level is <= 57%
LCO 3.4.6 applicability
Mode 4
LCO 3.4.6 required actions < 1 hour
- 1 PCS loop inoperable AND 2 SDC trains inoperable, then initiate action to restore a 2nd PCS loop or 1 SDC train to operable immediately
- No PCS loops or SDC trains operable OR no PCS loop in operation w/SDC flow through the reactor core not w/in limits, then suspend all operations involving reduction of PCS boron concentration AND initiate action to restore 1 PCS loop to operable and in operation OR initiate action to restore 1 SDC train to operable and >= 2810 gpm flow through the reactor core immediately
LCO 3.4.7 title
PCS Loops - Mode 5, Loops Filled
LCO 3.4.7 requirement
- 1 SDC train shall be operable and in operation w/>= 2810 gpm flow through the reactor core and either 1 additional SDC train shall be operable, or secondary side water level of each S/G shall be >= -84%
- All PCPs may not be in operation for <= 1 hour per 8 hour period provided no operations are permitted that would cause reduction of PCS boron concentration AND core outlet temperature is maintained at least 10 F below saturation temperature
- Both SDC trains may be inoperable for up to 2 hours for surveillance testing or maintenance, provided 1 SDC train is providing the required flow through the core, core outlet temperature is maintained at least 10 F below saturation temperature, AND each S/G secondary side water level is >= 84%
- Forced Circ (starting the 1st PCP) shall not be initiated unless S/G secondary temperature is <= reactor inlet temperature (Tc), S/G secondary temperature is < 100 F above Tc and SDC is isolated from the PCS and PCS heatup/cooldown rate is <= 10 F/hour, OR S/G secondary temperature is < 100 F above Tc and SDC is isolated from the PCS and PZR level is <= 57%
- PCPs P-50A and P-50B shall not be operated simultaneously
- All SDC trains may not be in operation during planned heatup to Mode 4 when at least 1 PCS loop is in operation