202.06 Flashcards

1
Q

When may it be necessary to establish a roof sector remote from the fire involved roof to keep an eye on roof conditions?

A

When an imminent collapse may occur

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How/why should ladder apparatus be strategically placed?

A

•To allow safe access from the roof
•emergency exit from roof
•rescue
•effective defensive operations if needed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Where must the company officer be if his crew is on the roof?

A

On the roof with the crew

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What must be considered before committing personnel above the fire?

A

The degree/extent of any signs of weakness to the structure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

No firefighter shall operate on or under what?

A

Bowstring roofs if there is any evidence that the fire has penetrated the attic space involving the trusses/roof structure in any way

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Ladder companies will not operate on what kind of metal roofs?

A

Pitched

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What kind of ventilation will be required for a single single-family/duplex structure fire covered with concrete or clay roof tiles?

A

Horizontal or PPV

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the danger of operating on a structure with photovoltaic roof tiles?

A

Electrical hazards and surface hazards that are not conductive to firefighting activities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the most efficient form of ventilation if applicable?

A

Vertical ventilation directly over the fire compartment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Vertical ventilation initially relieves what?

A

Built up heat/smoke

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Vertical ventilation without ineffective fire attack can lead to what?

A

Temporary improvement. That occurs but may be followed by rapid deterioration of conditions if hose line operation does not commence on the fire

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Vertical ventilation is best executed when what?

A

Sequenced simultaneous to and/or immediately following and effective fire attack

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Who’s responsibility? Is it to get water on the fire as quickly as possible and communicate when water is being flowed and adequate knockdown has begun

A

Fire attack companies

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Whose responsibility is it to ensure that water is being floated onto the fire and ventilation is needed?

A

Ladder companies responsible for ventilating

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are the objectives of roof sector when engaging in vertical ventilation operations?

A

• monitor radio at all times
• determine safe working surface
• confirm need for vertical vent
• coordinate with interior
• complete ventilation cuts
• consider/coordinate roof fire control ops
• provide progress report to command

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Once a standard size ventilation hole is cut and cleared. What must the crew do?

A

Move away from that area

17
Q

If more ventilation is needed after a hole has already been cut and cleared. What should roof sector do?

A

Cut additional holes safe distance away

18
Q

Crew must move from the first hole cut towards where with each consecutive ventilation hole

A

Towards safer area with each consecutive hole

19
Q

What are critical factors in consideration of additional vent holes?

A

• time
• roof, structural integrity
• overall effectiveness

20
Q

Vertical ventilation on a commercial building may not provide what?

A

Effective ventilation in the same manner as on residential

21
Q

Roof sector should not consider vertically venting what kind of fires?

A

Attic fires

22
Q

What should the communication after a vertical ventilation hole is cut include?

A

• fire/smoke conditions in the attic through the vent hole
• any change in a roof conditions and or structural stability