115 TRAINING REPORTING Flashcards
REFERENCES
NETCINST 1540.1 (series), Impaired Training and Education Report Policy and
Reporting Procedures
NETCINST 1500.7 (series), Missed Training Opportunity Reporting Policy and
Procedures
Impaired Training and Education Report (ITER)
reporting conditions that may reduce the ability to train and/or
educate personnel
N codes within NETC
N1 – Total Force Manpower N4 – Facilities and Logistics N6 – Chief Information Officer N7 – Learning and Development N8 – Resources, Requirements, and Assessments
NETC response for ITERs
NETC TPC
ITER conditions Red and Yellow
RED: cancels or stops training/education entirely, degrades NEC-producing training to the point that the NEC cannot be awarded
Yellow: delayed or cancelled classes, failure to instruct critical learning objectives, degradation in the ability to meet scheduled throughput
six ITER types
PEFCAC
1540.1B pg 4 – 5
Personnel Equipment Facilities Curricula Ammunition Correction
ITER categories
Initial
Update
COR
Missed Training Opportunity (MTO).
loss of a course quota by a command
five examples of MTO
- A command has a quota for a student who does not report command does not provide a replacement
- A command cancels a granted quota in four or fewer working days prior to a course’s convening without providing a replacement.
- A student does not meet course prerequisites.
- A student is absent from the course of instruction to the extent that he/she cannot obtain credit for the course.
- A student cannot obtain credit for the course of instruction due to the command recall of the student.
report MTO
TSCs/TSDs
Weekly MTO Report
Navy Message
Casualty Reporting (CASREP)
esigned to support the Chief of Naval Operations (CNO)
and fleet commanders in the management of assigned forces.
alerts the
Naval Safety Center for incidents which are crucial in mishap prevention
Initial CASREP
identifies, to an appropriate level of detail, the status of the casualty
Update CASREP
submits changes to previously submitted information
Correction CASREP
submitted when equipment,, is repaired and back in operational condition