110.2 - Content Development Flashcards
Describe and discuss the 7 stages involved in developing materials following the PPP- based curriculum development method
Planning- IDs resource req and sequence of events- TPPStage 1- det. job tasks, support sk/kn and level of performance- PPP table list, new/mod PPP tables, TPSStage 2- det. sk/kn that must be taught, LOs and instructional sequence- Prelim. TCCDStage 3-inst. mat. for inst. and students- LP, TG, Test, other sup. mat.Stage 4- CCA approved for pilot- course pilot/ pilot course monitoring reportStage 5- Begins w/ pilot course results- Final curriculum, FInal TCCD, CCA letter of promulgation (goes in TCCD front matter)Evaluation- surveillance, evaluation, change and rev of training mat. based on assessment and fleet FB
DIscuss the products of the Training Path System (TPS) stage 1
TOS- skills and knowledge to be learnedTLA-PPP line items to be taught, type of training environment and level of teachTAM-summary of training req for PPP tables listen in TPC by showing all TOS in each PPPTPC- graph showing complete training path for a category of ppl by listing courses in the path, and PPP tables covered by each
TOSTLATAMTPC
TOS- Training objective statementsTLA - training level assignmentsTAM - table assignment matrixTPC - training path chart
State and discuss the Training objective statement (TOS) codes for both knowledge and skill
Left of TOSS- designates PPP line items on the TLA formSkill- TO/(S)- skill (background)TO/(J)- skill (Task/function)O- operationP- preventative maintC- corrective maintM- maintKNowledge- F-familiarizationT-theoryNUmbered 0-4
Define the 3 task sets
ID group to be trained:Coordinator-overall authority (CO/XO)DIrector- direct supervisor(dept head/DIVO/LPO)Performer- hands on worker (tech)
Discuss the types of courses listed in a TPC
Background training- Prereq. (ATT)Replacement- Prep new for 1st assignment.formal schoolConversion- prev trained how to use new/mod systemAdvanced-Completes TOS coverage of systems undocumented fault isolationOnboard- watch station,GMT operator and maintenance
Identify when job sheet development should begin in the instructional systems design (ISD) process
As soon as TPS is done
What are the triggers and process for converting PPP based curriculum to task based curriculum
Triggered by revision or outdated course where training only needs to be knowledge/task based.