11 Overhaul Flashcards

1
Q

During overhaul what when determine whether firefighters firefighting activities should be conducted in all areas or placed off-limits

A

Structural integrity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What personnel should be used for overhaul

A

Fresh crews. Or personal that has gone through rehab

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Overhaul atmosphere should be monitored for what

A

Carbon monoxide other toxic materials asbestos

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is another purpose for overhaul

A

To leave the structure in as safe condition as possible

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What materials or debris should be removed from the building during overhaul

A

Only debris that presents a dangerous condition, burn structural material, furnishings, equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What components should be left inside the building during overhaul

A

Anything that does not pose a hazard or components or debris that fire investigators should inspect

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

True/false during overhaul after the emergency there is no reason for rushing or taking unnecessary chances

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Before any personnel are sent into the building for overhaul what must be done

A

Company and personal selected by the incident commander must check the area thoroughly, pre-inspection four holes in the floor or structural hazards

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

For a small fire what areas should be preinspected

A

Fire room. Adjacent rooms and room above and below

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Unsafe areas should be placed off limits by using what

A

Barrier tape

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

During the overhaul process firefighter should check the area for possible

A

Clues to the ignition of the fire

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

If possible overhaul assignments should be given to personnel who

A

Were not engaged in firefighting operations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

No one should be allowed inside the fire building for overhaul without first reporting to

A

The sector officer assigned to the area in which they will be working

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Overhaul personality should be well supervised within the structure because

A

They need to be well informed of the interior conditions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

If latter company personnel are not on scene or engage elsewhere on the fire ground who will have to perform overhaul

A

Engine company personnel well also advancing in operating hose lines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Because less water is needed for overhaul then for firefighting 2 1/2 inch attack lines can be

A

Reduced to inch and three-quarter attack lines for easier handling

17
Q

Where should overhaul begin

A

Close to the area where firefighting operations and it

18
Q

When the fire suspected behind walls or ceilings they should be opened until

A

A clean or unburned area is found the area should be wet down with water if necessary

19
Q

When I shaft has been the Avenue of travel for a fire areas adjacent to the shaft

A

Must be opened check for extension

20
Q

When checking above the fire during overhaul what may have to be removed

A

Baseboards and flooring

21
Q

During overhaul consideration kitchen cabinets often

A

Conceal openings for utilities through which fire can travel

22
Q

Any area or fixture that shows fire damage must be

A

Removed and thoroughly check for extension until no more fire damage is evident

23
Q

When the building is heavily damaged and water is deep work to be done to drain water from the floors

A

A whole can be made in outside walls from windowsill want to floor level to push water out or allowed to drain

24
Q

Conducting a pre-inspection before overhaul what will dictate the extent of inspection

A

The extent of the fire

25
Area in which cobwebs are found probably has not
Seen the effects of heat and smoke, cobwebs tend to shrivel up in temperatures higher than normal
26
If part of the floor must be removed during overhaul operations is best to use
A power saw to remove the flooring
27
Excess water should be removed during overhaul in a manner such as
Sweep it to the stairway, use a squeegee to push it down a soil pipe, make a hole in the Exterior wall
28
The task of systematically examining the aftermath of a fire scene to determine whether there is any fire sparks or embers remaining that could cause reignition
Overhaul