11 Overhaul Flashcards

1
Q

During overhaul what when determine whether firefighters firefighting activities should be conducted in all areas or placed off-limits

A

Structural integrity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What personnel should be used for overhaul

A

Fresh crews. Or personal that has gone through rehab

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Overhaul atmosphere should be monitored for what

A

Carbon monoxide other toxic materials asbestos

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is another purpose for overhaul

A

To leave the structure in as safe condition as possible

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What materials or debris should be removed from the building during overhaul

A

Only debris that presents a dangerous condition, burn structural material, furnishings, equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What components should be left inside the building during overhaul

A

Anything that does not pose a hazard or components or debris that fire investigators should inspect

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

True/false during overhaul after the emergency there is no reason for rushing or taking unnecessary chances

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Before any personnel are sent into the building for overhaul what must be done

A

Company and personal selected by the incident commander must check the area thoroughly, pre-inspection four holes in the floor or structural hazards

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

For a small fire what areas should be preinspected

A

Fire room. Adjacent rooms and room above and below

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Unsafe areas should be placed off limits by using what

A

Barrier tape

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

During the overhaul process firefighter should check the area for possible

A

Clues to the ignition of the fire

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

If possible overhaul assignments should be given to personnel who

A

Were not engaged in firefighting operations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

No one should be allowed inside the fire building for overhaul without first reporting to

A

The sector officer assigned to the area in which they will be working

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Overhaul personality should be well supervised within the structure because

A

They need to be well informed of the interior conditions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

If latter company personnel are not on scene or engage elsewhere on the fire ground who will have to perform overhaul

A

Engine company personnel well also advancing in operating hose lines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Because less water is needed for overhaul then for firefighting 2 1/2 inch attack lines can be

A

Reduced to inch and three-quarter attack lines for easier handling

17
Q

Where should overhaul begin

A

Close to the area where firefighting operations and it

18
Q

When the fire suspected behind walls or ceilings they should be opened until

A

A clean or unburned area is found the area should be wet down with water if necessary

19
Q

When I shaft has been the Avenue of travel for a fire areas adjacent to the shaft

A

Must be opened check for extension

20
Q

When checking above the fire during overhaul what may have to be removed

A

Baseboards and flooring

21
Q

During overhaul consideration kitchen cabinets often

A

Conceal openings for utilities through which fire can travel

22
Q

Any area or fixture that shows fire damage must be

A

Removed and thoroughly check for extension until no more fire damage is evident

23
Q

When the building is heavily damaged and water is deep work to be done to drain water from the floors

A

A whole can be made in outside walls from windowsill want to floor level to push water out or allowed to drain

24
Q

Conducting a pre-inspection before overhaul what will dictate the extent of inspection

A

The extent of the fire

25
Q

Area in which cobwebs are found probably has not

A

Seen the effects of heat and smoke, cobwebs tend to shrivel up in temperatures higher than normal

26
Q

If part of the floor must be removed during overhaul operations is best to use

A

A power saw to remove the flooring

27
Q

Excess water should be removed during overhaul in a manner such as

A

Sweep it to the stairway, use a squeegee to push it down a soil pipe, make a hole in the Exterior wall

28
Q

The task of systematically examining the aftermath of a fire scene to determine whether there is any fire sparks or embers remaining that could cause reignition

A

Overhaul