Water Efficiency Flashcards
What are the Prereq’s for the Water Efficiency Category?
1) Outdoor Water Use Reduction
2) Indoor Water Use Reduction
3) Building-Level Water Metering
What are the Credits for the Water Efficiency Category?
1) Outdoor Water Use Reduction (2 points)
2) Indoor Water Use Reduction (6 points)
3) Cooling Tower Water Use (2 points)
4) Water Metering (1 point)
What Water Efficiency Prereq’s and Credits qualify for Exemplary performance?
1) WE-C Indoor Water Use Reduction
What are the Options and points associated with WE-R Outdoor Water Use Reduction?
1) Option 1: No Irrigation Required
or
2) Option 2: Reduced Irrigation
What are the guidelines to meet “Option 1: No Irrigation Required” of WE-R Outdoor Water Use Reduction?
Project landscape will not need irrigation beyond the maximum 2 year establishment period.
What are the documentation requirements for “Option 1: No Irrigation Required” of WE-R Outdoor Water Use Reduction?
1) Map showing vegetated areas.
2) Narrative on plant species and water requirements.
What are the guidelines to meet “Option 2: Reduced Irrigation” of WE-R Outdoor Water Use Reduction?
1) Reduce water consumption by 30% from baseline calculated during peak watering month.
2) Calculate water consumption using EPA Water Sense Water Budget Tool.
3) Can’t use non-potable water sources to establish 30% reduction.
What are the documentation requirements for “Option 2: Reduced Irrigation” of WE-R Outdoor Water Use Reduction?
1) Map showing location and size of each landscape zone.
2) Water Sense Water Budget Tool report
What are the guidelines to meet WE-R Indoor Water Use Reduction?
1) Reduce aggregate water consumption of fixtures in table by 20%
2) Newly installed fixtures should be WaterSense
3) Appliances and processes must meet Energy Star requirements
What are the water fixtures referenced in the water consumption table for WE-R Indoor Water Use Reduction?
1) Toilet (1.6gpf)
2) Urinal (1gpf)
3) Public Lavatory Faucet (.5gpm)
4) Private Lavatory Faucet (2.2gpm)
5) Kitchen Faucet (2.2gpm)
6) Shower head (2.5gpm)
What are the documentation requirements for WE-R Indoor Water Use Reduction?
1) Fixture and fittings cutsheets
2) Indoor water use calculations
3) Appliance cutsheets
What are the guidelines to meet WE-R Building Level Water Metering?
1) Install permanent water meters to measure total potable water use.
2) Project should commit to sharing meter data with USGBC on a monthly basis for 5 years.
What are the documentation requirements for WE-R Building Level Water Metering?
1) Meter declaration describing location of all water meters.
2) Sharing commitment.
What are the Options and points associated with WE-C Outdoor Water Use Reduction?
1) Option 1: No Irrigation Required (2 points)
or
2) Option 2: Reduced Irrigation (2 points)
What are the guidelines to meet “Option 1: No Irrigation Required” of WE-C Outdoor Water Use Reduction?
Project landscape will not need irrigation beyond the maximum 2 year establishment period.