Integrative Process Flashcards

1
Q

What are the Prereq’s for the Integrative Process Category?

A

1) P - Integrated Project Planning and Design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the Credits for the Integration Process Category?

A

1) C - Integrative Process (1 point)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What IP Prereq’s and Credits qualify for Exemplary performance?

A

None

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What (4) processes should be implemented to complete IP-P Integrated Project Planning and Design?

A

1) Prepare Owners Project Requirements (OPR) that includes a health mission statement.
2) Conduct preliminary meeting with minimum of 4 key members to create LEED action plan.
3) Assemble team with a minimum of 4 members in addition to the owner and owners rep.
4) Conduct a minimum 4-hour charrette.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the (2) documentation requirements for IP-P Integrated Project Planning and Design?

A

1) A narrative about how the Health Mission Statement addresses the prerequisite requirements.
2) LEED Action Plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

During what phase should the IP-P Integrated Project Planning and design be implemented?

A

Pre-Design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What document are the project teams advised to review to implement a successful Integration process?

A

ANSI Consensus National Standard Guide 2.0 for Design and Construction of Sustainable Buildings and Communities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the (2) analysis that need to be completed for IP-C Integrative Process?

A

1) Perform Energy Modeling
2) Preliminary Water Budget Analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the (1) documentation requirement for IP-C Integrative Process?

A

1) Integrative Process Worksheet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

During what phase should the IP-C Integrative Process be implemented?

A

Schematic Design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How many points can you get for the IP-C Integrated Process Credit?

A

1 point

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What steps should the team take to complete the Energy System analysis associated with IP-C Integrated Process?

A

1) Perform a Simple Box Energy Modeling

2) Document how this analyses informed the project’s
OPR, BOD, and design in the Integrative Process Worksheet.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The project team should use the IP-C Integrative Process Energy Model to address at least two strategies associated with what items?

A

1) Site conditions
2) Massing and orientation
3) Basic envelope attributes
4) Lighting levels
5) Thermal comfort ranges
6) Plug and process load needs
7) Programmatic and operational parameters.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What steps should the team take to complete the Water System analysis associated with IP-C Integrated Process?

A

1) Perform a Preliminary Water Budget Analysis
2) Find at least one nonpotable water source and reduce the burden on the municipality
2) Document how this analyses informed the project’s OPR, BOD, and design in the Integrative Process Worksheet.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The project team should use the IP-C Integrative Process Water analysis to address at least two strategies associated with what items?

A

1) Indoor water demand
2) Outdoor water demand
3) Process water demand
4) Supply sources.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What should the project team do after the completion of the Energy system and Water system analysis?

A

Conduct a Goal Setting Workshop / Design Charrette