Sustainable Sites Flashcards
What are the Prereq’s for the Sustainable Site Category?
1) Construction Activity Pollution Prevention
2) Environmental Site Assessment
What are the Credits for the Sustainable Site Category?
1) Site Assessment (1 point)
2) Protect and Restore Habitat (2 points)
3) Open Space (1 point)
4) Rainwater Management (3 points)
5) Heat Island Reduction (2 points)
6) Light Pollution Reduction (1 point)
7) Site Master Plan (1 point)
8) Tenant Design and Construction Guidelines (1 point)
9) Places of Respite (1 point)
10) Direct Exterior Access (1 point)
11) Joint Use of Facilities (1 point)
What Sustainable Site Prereq’s and Credits qualify for Exemplary performance?
1) SS-C Protect and Restore Habitat
2) SS-C Rainwater Management
3) SS-C Heat Island Reduction
4) SS-C Places of Respite
What are the guidelines to meet SS-P Construction Activity Pollution Prevention?
1) Create erosion and sediment control plan
2) Plan should conform to 2012 US Environmental Protection Agency and Construction General Permit
What are the documentation requirements for SS-P Construction Activity Pollution Prevention?
1) Description of compliance with EPA CGP.
What are the guidelines to meet SS-P Environmental Site Assessment?
1) Conduct Phase I ESA (ASTM E1527)
2) If contaminates are found, conduct Phase II ESA (ASTM E1903)
3) Remediate to local, state or national standard.
What are the documentation requirements for SS-P Environmental Site Assessment?
1) Phase I, II or III EPA as applicable.
2) Narrative on contamination and verification of fix.
What are the guidelines to meet SS-C Site Assessment?
Prepare site survey to include:
1) Topography
2) Hydrology
3) Climate
4) Vegetation
5) Soils
6) Human Use
7) Human Health Effects
What are the documentation requirements for SS-C Site Assessment?
Site assessment plan with worksheet or narrative.
How many points can you get for the SS-C Site Assessment Credit?
1 point
What are the Options and points associated with SS-C Protect and Restore Habitat?
1) Option 1: On-Site Restoration (2 points)
or
2) Option 2: Financial Support (1 point)
What are the guidelines to meet “Option 1: On-Site Restoration” of SS-C Protect and Restore Habitat?
1) Protect 40% of greenfield area on site if it exists.
2) Restore 30% of disturbed land.
3) If building density of 1.5 Floor-Area-Ratio (FAR) or greater, vegetated roof can be included in restored percentage.
What are the documentation requirements for “Option 1: On-Site Restoration” of SS-C Protect and Restore Habitat?
1) Greenfield calculations
2) Narrative on greenfield area.
3) Site plan showing vegetated areas.
4) Native vegetation calculations.
5) Reference soil test results
6) FAR for project with vegetated roof.
What are the guidelines to meet “Option 2: Financial Support” of SS-C Protect and Restore Habitat?
1) Provide financial support to local Land Trust of $.04 per SF based on total site area.
2) In US, Land trust must be accredited by Land Trust Alliance.
3) Outside US, Land Trust org must be located within 100 miles of project.
What are the documentation requirements for “Option 2: Financial Support” of SS-C Protect and Restore Habitat?
1) Greenfield calculations
2) Narrative on greenfield area.
3) Financial support calculations and agreement with Land Trust.
4) Outside US, confirmation that org. is nationally or locally recognized.
What are the Exemplary Performance requirements of SS-C Protect and Restore Habitat?
1) Option 1, double restoration requirements to 60%.
2) Option 2,double financial requirements to $.08 per SF.
What are the guidelines to meet SS-C Open Space?
1) Provide outdoor space more than or equal to 30% of total site area.
2) 25% of the provided 30% must be vegetated space.
What type of development would qualify for outdoor space under SS-C Open Space?
1) Pedestrian oriented pavement
2) Recreation oriented pavement
3) Garden space for visual interest
4) Garden space for food production
5) Preserved or created habitat.
6) Vegetated wetlands or ponds with 1:4 slope or less.
What are the documentation requirements of SS-C Open Space?
1) Map showing open space.
2) Open space calculations
3) Narrative of open space accessibility.
4) FAR for projects with vegetated roofs.
How many points can you get for the SS-C Open Space Credit?
1 point
What are the Options and points associated with SS-C Rainwater Management?
1) Option 1: Percentile of Rainfall Events “Path 1 - 95th Percentile” (2 points)
or
2) Option 1: Percentile of Rainfall Events “Path 2 - 98th Percentile” (3 points)
or
3) Option 1: Percentile of Rainfall Events “Path 3 - 85th Percentile” (3 points)
or
4) Option 2: Natural Land Cover Condition (3 points)
What are the guidelines to meet “Option 1: Percentile of Rainfall events Path 1” of SS-C Rainwater Management?
1) Use “EPA Technical Guidance Under Section 438” to determine rainfall data.
2) Use green infrastructure and low impact development to manage on-site rainwater to 95th percentile.
What are the guidelines to meet “Option 1: Percentile of Rainfall events Path 2” of SS-C Rainwater Management?
1) Use “EPA Technical Guidance Under Section 438” to determine rainfall data.
2) Use green infrastructure and low impact development to manage on-site rainwater to 98th percentile.
What are the guidelines to meet “Option 1: Percentile of Rainfall events Path 3” of SS-C Rainwater Management?
1) For zero lot line projects with minimum FAR of 1.5.
2) Use green infrastructure and low impact development to manage on-site rainwater to 85th percentile.